Top 15 Data Center Companies in India (2026 List)

blog

Top 15 Data Center Companies in India (2026 List)

Updated on Nov 17, 2026, 06:16 PM IST
Written by Xaviour Raymond

The top data center companies in India by operational IT capacity are STT GDC India (400+ MW), CtrlS Datacenters (370+ MW), Nxtra by Airtel (~300 MW), NTT DATA (~260 MW), and Sify Technologies (188 MW). These companies have established some of the largest data center projects in India across major markets such as Mumbai, Hyderabad, Chennai, Bengaluru, and Navi Mumbai.

 

India's data centre companies are expanding faster than at any point in the market's history. Hyperscale cloud demand, data localisation, and a new wave of AI and GPU projects are pushing operators into new cities and much larger campuses. 

 

This list ranks the 15 leading data center companies in India, then covers who else is building, which companies are listed, and who is building AI data centers.

List of the Top 15 Data Center Companies in India by Operational IT Capacity

Company

Operational IT load

Founded

India HQ

Listed parent Company

STT GDC India

400+ MW

2016 (India JV)

Mumbai, MH

Tata Communications (26%), NSE/BSE

CtrlS Datacenters

370+ MW

2007

Hyderabad, TS

Unlisted

Nxtra by Airtel

~300 MW

2005

Mumbai, MH

Bharti Airtel, NSE/BSE

NTT DATA

290 MW

2017

Navi Mumbai, MH

NTT, Inc. (Tokyo)

Sify Technologies

188 MW

2013

New Delhi

Sify Technologies, Nasdaq

CapitaLand India

108 MW

2021

Navi Mumbai

CapitaLand India Trust, SGX

AdaniConneX

94.6 MW

2021

Mumbai, MH

Adani Enterprises, NSE/BSE

Yotta Data Services

84 MW

1995

Chennai, TN

Unlisted (IPO planned)

Pi Datacenters

60+ MW

2019

Navi Mumbai, MH

Unlisted

Princeton Digital Group

~50 MW

2014

Hyderabad, TS

Unlisted

L&T-Vyoma

30 MW

2021

Ahmedabad, GJ

Larsen & Toubro, NSE/BSE

Digital Connexion

20 MW

2002

Mumbai, MH / Jamnagar, GJ

JV of Reliance, Brookfield, Digital Realty

Iron Mountain (Web Werks)

14 MW

2024

Mumbai

Iron Mountain, NYSE

Equinix

20 MW

2021

Mumbai, MH

Equinix, Nasdaq

Reliance Industries (Jio)

None live yet

2021

Mumbai, MH

Reliance Industries, NSE/BSE

Listed Data Center Companies in India

India does not yet have a listed pure-play data center operator. Most exposure comes through listed parent companies, and the first standalone listing is still pending: Sify Infinit Spaces received SEBI approval for an INR 3,700 crore IPO in January 2026 but put it on hold in September 2026. Yotta Data Services is also preparing an IPO, and STT GDC India's shareholders are running a sale process.

 

Company

Listed entity

Exchange

Data center business

Nxtra by Airtel

Bharti Airtel

NSE, BSE

Airtel holds a controlling stake in Nxtra (~300 MW)

STT GDC India

Tata Communications

NSE, BSE

26% stake in STT GDC India

AdaniConneX

Adani Enterprises

NSE, BSE

50:50 joint venture with EdgeConneX

Reliance Jio / Digital Connexion

Reliance Industries

NSE, BSE

Jamnagar AI data center; Digital Connexion JV

L&T-Vyoma

Larsen & Toubro

NSE, BSE

Data center business (Vyoma) with an INR 10,000 crore allocation

Anant Raj

Anant Raj Ltd

NSE, BSE

Data center development in Delhi-NCR and Haryana

Sify Technologies

Sify Technologies

Nasdaq

Parent of Sify Infinite Spaces (14 data centers)

CapitaLand India

CapitaLand India Trust

SGX

Three data center campuses under development

Equinix

Equinix, Inc.

Nasdaq

Four IBX data centers in Mumbai and Chennai

Iron Mountain

Iron Mountain, Inc.

NYSE

Owns Web Werks; Mumbai 85 MW campus

NTT DATA

NTT, Inc.

Tokyo Stock Exchange

NTT Global Data Centers India

Digital Connexion

Digital Realty / Brookfield

NYSE

Joint venture partner with Reliance

This section lists listed entities for information only. It is not investment advice.

Top 15 Data Center Companies in India: Company Profiles

1. STT GDC India

STT Global Data Centers India Pvt Ltd
STT GDC India (ST Telemedia Global Data Centres India) entered the market in 2016 through a joint venture with Tata Communications. It operates 30 data centers across 10 Indian cities, with more than 400 MW of critical IT load capacity, and serves hyperscale cloud, enterprise, and AI customers. STT GDC holds 74% of the India business, and Tata Communications holds 26%.

 

STT GDC India committed INR 4,200 crore in February 2026 to a 45 MW AI-ready campus in Chennai, where the first 7.2 MW phase of Chennai 7 (Siruseri) is live. In July 2026, it inaugurated STT Jaipur 1, an AI-ready facility with up to 6 MW of critical IT load. In October 2026, AI cloud provider Neysa chose STT Noida 2 to host up to 9,000 GPUs in a first phase, with go-live expected from Q1 2027.

 

The company is expanding its footprint across several major markets. In Telangana, STT GDC India signed an MoU with the state government to develop a data center at Mucherla in Hyderabad, backed by a USD 412 million investment. In Maharashtra, it has partnered with the state government on a USD 568 million (INR 5,000 crore) investment to develop AI-focused data center infrastructure in Mumbai and Pune.

 

In February 2026, KKR and Singtel agreed to buy the 82% of the global STT GDC platform they did not already own. Shareholders led by KKR are now running a sale process for the India business seeking a valuation above USD 5.5 billion, with non-binding offers expected between late November and mid-December 2026. STT GDC India reported FY26 revenue from operations of INR 2,747.5 crore, up 17.8%.

 

On 16 March 2026, STT GDC India also began construction of its new Palava campus in Maharashtra. The 46-acre campus will initially provide 50 MW of IT load capacity and is designed to scale to approximately 400 MW, positioning Palava as an emerging data center hub in the Mumbai Metropolitan Region.

 

The company is also expanding internationally, including the development of its second data center facility in Malaysia.

 

Recent Developments:

  • Stake sale: Shareholders appointed advisers for a sale of the India business; non-binding offers are expected late November to mid-December 2026.

  • Neysa GPU deal: Up to 9,000 GPUs at STT Noida 2, announced in October 2026, with go-live from Q1 2027.

  • Jaipur: STT Jaipur 1 inaugurated in July 2026 with up to 6 MW of critical IT load.

  • Chennai AI campus: INR 4,200 crore committed in February 2026 to a 45 MW AI-ready campus; the first 7.2 MW is live.

  • State MoUs: Agreements with Karnataka, Maharashtra, Telangana and Uttar Pradesh for large AI-ready data centers.

Upcoming STT GDC India Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Chennai

Chennai 7 (Siruseri) AI-ready campus

Under construction (phase 1 live)

45 MW

Noida

STT Noida 2 (Neysa GPU deployment)

Under construction

Up to 9,000 GPUs

Mumbai

Palava campus

Under construction

Not disclosed

Navi Mumbai

New land parcel

Planned

Not disclosed

Trusted by Leading EPCs & Manufacturers

Find the Latest Data Center Projects in India

Gain exclusive access to 12000+ data center projects across 140+ countries with detailed project timelines and stakeholder information.

Request Free Trial → Learn More →

No credit card Up-to-date coverage

2. CtrlS Datacenters

CtrlS Data Centers Ltd
Founded in 2007, CtrlS Datacenters operates 19 data centers across nine Indian markets, with more than 370 MW of capacity and a planned pipeline of more than 4.4 GW by 2030 at various stages of execution. The company focuses on hyperscale data centers, enterprise and AI-ready infrastructure, including high-density computing and liquid-cooling capabilities.

 

CtrlS Datacenters has operationalized the first phase of its Kolkata campus in New Town, delivering 16 MW of IT load, with the full campus planned to reach 60 MW. The company also launched a 72 MW hyperscale data center in Chennai in February 2025, backed by an investment of approximately INR 4,000 crore.

 

In October 2026, it opened an INR 400 crore data center in Patna's Patliputra Industrial Area with an initial IT load of 12 MW, and signed a letter of intent with the Bihar government for a proposed INR 10,000 crore, 150 MW hyperscale AI factory in Bodh Gaya.

 

Recent Developments:

  • Bihar AI factory: Letter of intent signed in October 2026 for a 150 MW, INR 10,000 crore AI factory in Bodh Gaya.

  • Patna: 12 MW data center opened in October 2026 with an investment of INR 400 crore.

  • CPP Investments: Up to INR 7,000 crore (CAD 1 billion) investment commitment announced in June 2026.

  • Mumbai expansion: DC6 and DC7 are planned with a combined 95 MW power capacity.

  • Hyderabad expansion: Chandan Valley campus planned with six data center buildings and 612 MW power capacity.

  • Edge expansion: More than 20 edge data centers planned in Tier 2 and Tier 3 cities, including Bhubaneswar, Bhopal and Kochi, alongside existing facilities in Lucknow, Patna and Ahmedabad.

  • Leadership: Madhusudan Pattanaik was appointed Executive Vice President in November 2026.

Upcoming CtrlS Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Hyderabad

Chandan Valley Campus

Upcoming

612 MW

Bodh Gaya, Bihar

Hyperscale AI factory

Letter of intent

150 MW

Mumbai

DC6 & DC7

Upcoming

95 MW

Kolkata

New Town campus (later phases)

Under development

60 MW at full build

Bhubaneswar

Edge DC

Upcoming

Not disclosed

Bhopal

Edge DC

Upcoming

Not disclosed

Kochi

Edge DC

Upcoming

Not disclosed

3. Nxtra by Airtel

Nxtra Data limited
Nxtra Data is Bharti Airtel's data center subsidiary and one of India's largest operators by footprint. It runs about 300 MW of capacity across 14 large core data centers and more than 120 edge facilities, and is developing AI-ready campuses in Chennai, Mumbai and Kolkata. Airtel's target is to scale Nxtra to 1 GW within the next few years, for roughly a quarter of India's market.

 

On March 30, 2026, Airtel announced a USD 1 billion investment in Nxtra led by Alpha Wave Global (USD 435 million), existing investor Carlyle (USD 240 million) and Anchorage Capital (USD 35 million), with Airtel funding the rest and keeping control. The deal values Nxtra at about USD 3.1 billion after closing, subject to regulatory approval.

 

Nxtra is also a partner in Google's USD 15 billion, gigawatt-scale AI hub in Visakhapatnam, which Google is developing with AdaniConneX and Airtel.

 

Recent Developments:

  • USD 1 billion raise: Announced March 30, 2026, led by Alpha Wave Global and Carlyle; post-deal valuation about USD 3.1 billion.

  • 1 GW target: Airtel plans to more than triple Nxtra's capacity to 1 GW.

  • Google partnership: Partner in the Visakhapatnam AI hub announced in October 2025.

  • AI-ready campuses: Under development in Chennai, Mumbai, and Kolkata.

Upcoming Nxtra Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Visakhapatnam

Google AI hub (with AdaniConneX)

Under construction

1 GW hub

Chennai

AI-ready campus

Under development

Not disclosed

Mumbai

AI-ready campus

Under development

Not disclosed

Kolkata

AI-ready campus

Under development

Not disclosed

4. NTT DATA (NTT Global Data Centers India)

NTT DATA Business Solutions Pvt Ltd
NTT entered India in 2012 by acquiring Netmagic, and now runs one of the country's largest data center platforms through NTT Global Data Centers. In January 2024, NTT reported more than 265 MW of capacity across 18 data centers in Delhi-NCR, Mumbai, Chennai and Bengaluru, and it has since added major campuses in Navi Mumbai, Kolkata and Bengaluru. Its facilities serve hyperscale cloud providers, enterprises and AI workloads, with liquid immersion cooling and direct-to-chip cooling deployed at its newer sites.

 

In March 2025, NTT launched NAV2 in Navi Mumbai, its largest campus in India: a 500 MW facility with 336 MW of IT capacity, including what it describes as India's largest single-building data center at 50 MW of IT load. 

 

In June 2026, NTT DATA opened Bengaluru 4 near Kempegowda International Airport, the city's largest data center campus, with 67.2 MW of critical IT load planned across three buildings; the first building, BLR4A, is live with 22.4 MW. The company also runs a 40 MW facility in Kolkata and the Noida 2 campus, planned for 52.8 MW across two buildings.

 

NTT DATA has announced plans to invest about USD 1.2 billion in an AI data center cluster in India, and is building the MIST submarine cable system to strengthen connectivity into its Mumbai and Chennai campuses.

 

Recent Developments:

  • Bengaluru 4: Opened June 13, 2026, with 22.4 MW live and 67.2 MW of IT load planned.

  • NAV2 Navi Mumbai: 500 MW campus with 336 MW of IT capacity launched in March 2025; three data centers live at launch.

  • AI investment: About USD 1.2 billion planned for an AI data center cluster in India.

  • Connectivity: MIST submarine cable under development to link India with Southeast Asia.

Upcoming NTT Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Bengaluru

Bengaluru 4 (BLR4B, BLR4C)

Under construction / planned

44.8 MW IT (remaining)

Navi Mumbai

NAV2 (remaining buildings)

Under development

336 MW IT at full build

Noida

Noida 2 (second building)

Planned

30.4 MW IT

To be announced

AI data center cluster

Announced

USD 1.2 billion investment

 

5. Sify Technologies

Sify Technologies

Founded in 1995 as one of India's first internet service providers, Sify Technologies runs its data center business through Sify Infinit Spaces Limited (SISL). SISL operates 14 data centers in India with 188 MW of operational IT power. Its parent, Sify Technologies, is listed on Nasdaq.

 

In June 2026, the International Finance Corporation provided SISL with a USD 71 million sustainability-linked loan and agreed to help mobilise up to USD 300 million more to fund two new data centers in Navi Mumbai and Chennai with a combined 103 MW of capacity. Both facilities are designed for high-density AI and computing workloads.

 

SISL received SEBI approval in January 2026 for an INR 3,700 crore IPO, which would make it India's first listed pure-play data center company. In September 2026, the company put the IPO on hold after a gap between its valuation expectations and investor offers, and said it may return to the market next year.

 

Recent Developments:

  • IFC funding: USD 71 million loan plus up to USD 300 million in mobilised financing, announced in June 2026.

  • IPO: INR 3,700 crore IPO approved by SEBI in January 2026; put on hold in September 2026.

  • New capacity: Two AI-ready data centers in Navi Mumbai and Chennai totalling 103 MW.

Upcoming Sify Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Navi Mumbai

New AI-ready data center

Under development

103 MW combined with Chennai

Chennai

New AI-ready data center

Under development

103 MW combined with Navi Mumbai

6. CapitaLand India

CapitaLand India (CLINT)
CapitaLand India Trust (CLINT), the Singapore-listed business trust, has built a data center portfolio alongside its Indian IT parks. Its first data center, in Navi Mumbai, was completed in 2025 with 108 MW of capacity and is fully leased to a global hyperscaler. Three more data centers are under development in Navi Mumbai, Chennai and Hyderabad, and 53% of their combined gross power capacity was pre-leased as of January 2026.

 

In January 2026, CLINT signed its second long-term hyperscaler agreement for Tower 2 of CapitaLand DC Navi Mumbai in Airoli. Tower 2 has a planned IT load of 37 MW (55 MW gross power), is expected to be completed in 4Q 2026, and will be handed over to the tenant progressively from 1H 2027. In October 2026, CapitaLand unveiled CapitaLand Data Centre Chennai 01 in Ambattur, a planned INR 1,940 crore facility with 53 MW of gross power and 34 MW of IT power across 13 data halls.

 

In December 2025, CLINT agreed to sell 20.2% stakes in its three under-development data centers to the CapitaLand India Data Centre Fund, keeping 79.8%. The joint venture gives CLINT rights to participate in up to 33% of future India data center opportunities.

 

Recent Developments:

  • Chennai 01: INR 1,940 crore, 34 MW IT data center unveiled in Ambattur in October 2026.

  • Second hyperscaler lease: Long-term agreement for Navi Mumbai Tower 2 signed January 15, 2026.

  • Data center fund: 20.2% of the three under-development data centers sold to CapitaLand India Data Centre Fund.

  • Pre-leasing: 53% of gross power capacity across the three new data centers pre-leased.

Upcoming CapitaLand Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Navi Mumbai

CapitaLand DC Navi Mumbai Tower 2

Under construction (completion 4Q 2026)

37 MW IT / 55 MW gross

Chennai

CapitaLand Data Centre Chennai 01

Under construction

34 MW IT / 53 MW gross

Hyderabad

CapitaLand DC Hyderabad

Under construction

Not disclosed

 

7. AdaniConneX

AdaniConnex
Founded in 2021 as a 50:50 joint venture between Adani Enterprises and EdgeConneX, AdaniConneX operates more than 55 MW of live data center capacity and has a cumulative order book of more than 560 MW. Its operational flagship is Chennai 1 in SIPCOT IT Park, Siruseri, with 17 MW of IT load and planned to reach 33 MW, with further sites in Noida, Pune and Hyderabad. The company's target is a 2 GW renewable-powered data center footprint by 2030.

 

AdaniConneX is building the first 400 MW phase of the 1 GW AI data center hub in Visakhapatnam that Google announced with Adani and Airtel in October 2025. Construction started at the Tarluvada site in April 2026. Adani Enterprises' CFO put the cost of the 400 MW phase at about INR 28,000-30,000 crore, excluding GPUs, with the initial capacity expected to be operational within about two and a half years.

 

In October 2026, CoreWeave chose AdaniConneX's Taloja campus in Navi Mumbai for 240 MW of AI cloud capacity across three 80 MW buildings, with an option to add another 240 MW. The first phase is expected to be available in mid-2028, running Nvidia's Vera Rubin platform with direct liquid cooling.

 

Recent Developments:

  • CoreWeave: 240 MW across three buildings at Taloja, Navi Mumbai, announced October 8, 2026; option for 240 MW more.

  • Google Visakhapatnam: Construction of the 400 MW first phase began in April 2026.

  • Financing: Phase 1 structured as project finance with 70–80% debt, per the July 29, 2026 earnings call.

  • Order book: More than 560 MW cumulative order book.

Upcoming AdaniConneX Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Visakhapatnam

Google AI hub, phase 1

Under construction

400 MW (of a 1 GW hub)

Navi Mumbai

Taloja campus (CoreWeave)

Under development

240 MW, option to 480 MW

Chennai

Chennai 1 (later phases)

Under development

33 MW IT at full build

8. Yotta Data Services

Yotta Data Services Pvt Ltd
Backed by the Hiranandani Group, Yotta Data Services operates hyperscale data centers in Navi Mumbai (NM1, 52 MW of IT power) and Greater Noida (D1, 30 MW of IT power), plus a 2 MW facility in GIFT City, Gujarat. Yotta has positioned itself as India's leading AI cloud provider through its Shakti Cloud platform, and supplies more than 10,000 B300 GPUs to the IndiaAI Mission.

 

In February 2026, Yotta announced a four-year deal with Nvidia worth more than USD 1 billion, and a supercluster of 20,736 liquid-cooled Nvidia Blackwell Ultra GPUs worth more than USD 2 billion, expected to go live by August 2026. The supercluster is housed in Yotta's new D2 data center at Greater Noida, which has 60 MW of capacity and can scale to 250 MW. Yotta plans to invest about USD 7 billion by FY27 and expand to about 85,000 GPUs.

 

Yotta is preparing an Indian IPO that could raise up to USD 1.5 billion at a valuation of about USD 6 billion, according to a September 2026 report, with draft papers expected as early as October 2026. It is also reported to be ordering 50,000 Nvidia Vera Rubin GPUs and 45,000 GB300 accelerators; these plans have not yet appeared in a filed offer document.

 

Recent Developments:

  • Blackwell supercluster: 20,736 Blackwell Ultra GPUs at D2 Greater Noida, more than USD 2 billion, go-live targeted for August 2026.

  • Nvidia deal: Four-year agreement worth more than USD 1 billion, announced February 18, 2026.

  • IPO: Up to USD 1.5 billion IPO under preparation; draft prospectus expected from October 2026.

  • Funding: About USD 150 million raised in 2026 at an estimated USD 3.9 billion valuation.

Upcoming Yotta Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Greater Noida

D2 hyperscale data center

Phase 1 live / expanding

60 MW, scalable to 250 MW

Navi Mumbai

NM Park (5 buildings)

Planned

160 MW

Greater Noida

Greater Noida Park (6 buildings)

Planned

160 MW

Chennai

Chennai Park (5 buildings)

Planned

140 MW

9. Pi Datacenters

Pi Datacenters
Pi Datacenters has operated for more than a decade and runs a 60 MW hyperscale data center campus in Amaravati, Andhra Pradesh. The company offers hyperscale, colocation, AI-ready, and cloud services.

 

In April 2026, Pi Datacenters announced a 23 MW national expansion plan, with JLL as its exclusive adviser. The first phase is a 3 MW data center in Central Mumbai, its first in the city, scheduled to go live in August 2026. A 3 MW facility in Hyderabad was expected to be operational in October 2026.

 

The expansion takes Pi beyond Andhra Pradesh into Mumbai, India's largest data center market, and Hyderabad. About 17 MW of the 23 MW plan is still to be allocated to specific sites.

 

Recent Developments:

  • 23 MW expansion: National expansion plan announced April 13, 2026, with JLL advising.

  • Mumbai: 3 MW data center in Central Mumbai scheduled to go live in August 2026.

  • Hyderabad: 3 MW facility expected to be operational in October 2026.

Upcoming Pi Datacenters Projects in India:

 

Location

Project

Status

Capacity / Scale

Mumbai

Central Mumbai data center

Launching (August 2026)

3 MW

Hyderabad

Hyderabad data center

Launching (October 2026)

3 MW

To be announced

National expansion (remaining phases)

Planned

~17 MW

10. Princeton Digital Group (PDG)

Princeton Digital Group (PDG)
Singapore-headquartered Princeton Digital Group entered India in 2022 and has grown into one of the country's largest hyperscale developers. Its India platform reached 1 GW of operating and planned capacity in March 2026, across campuses in Navi Mumbai, Chennai and Hyderabad. Across Asia, PDG has more than 1.8 GW in seven countries.

 

PDG's flagship MU1 campus in Airoli, Navi Mumbai, is a five-building campus with 150 MW of capacity, supplied with clean electricity through an agreement with Tata Power. It broke ground on MU2, a planned 120 MW campus in the Navi Mumbai region, and is developing CH1, a 72 MW three-building campus in northern Chennai, and HY1, a 90 MW three-building campus in Hyderabad.

 

On March 24, 2026, PDG announced a multi-site acquisition in Mumbai and Hyderabad that added 210 MW of capacity with power secured and key land approvals in place. The company says the deal nearly doubled its planned India capacity, and that it has committed about USD 2.5 billion to India to date.

 

Recent Developments:

  • 210 MW acquisition: Multi-site acquisition in Mumbai and Hyderabad announced March 24, 2026, taking PDG's India platform to 1 GW.

  • Investment: About USD 2.5 billion committed to India to date.

  • MU2: Construction started on the 120 MW Navi Mumbai campus.

  • Renewable power: Clean electricity supply agreement with Tata Power for MU1.

Upcoming PDG Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Navi Mumbai

MU2

Under construction

120 MW

Hyderabad

HY1

Under development

90 MW

Chennai

CH1

Planned

72 MW

Mumbai and Hyderabad

Acquired sites (2026)

Planned

210 MW

Trusted by Leading EPCs & Manufacturers

Find the Latest Data Center Projects in India

Gain exclusive access to 12000+ data center projects across 140+ countries with detailed project timelines and stakeholder information.

Request Free Trial → Learn More →

No credit card Up-to-date coverage

11. L&T-Vyoma

L&T Cloudfiniti
Larsen & Toubro runs its data center business under the Vyoma brand. Vyoma has 30 MW of available capacity, including 12 MW commissioned at Kanchipuram near Chennai, with a further 6 MW close to commissioning, according to L&T's Q4 FY26 earnings call in May 2026. Another 30 MW is under construction at Mahape, Navi Mumbai.

 

L&T has allocated about INR 10,000 crore to the data center business under its Lakshya 2031 plan, targeting about 200 MW over time across Visakhapatnam, Bengaluru and Mumbai for hyperscale and quantum computing customers.

 

L&T has signed an MoU with Nvidia for build-to-suit AI infrastructure and plans to go to market once enough suitable capacity is assured. It expects returns of about 13–14% at optimal utilisation. Vyoma.AI commenced construction of its 52 MW AI-ready green data center in Chennai following the Bhoomi Pujan ceremony announced on 28 October 2026.

 

Recent Developments:

  • Capacity: 30 MW available and 30 MW under construction, per the May 2026 earnings call.

  • Investment: About INR 10,000 crore allocated under Lakshya 2031.

  • Nvidia: MoU for build-to-suit AI data centers.

Upcoming L&T-Vyoma Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Mahape, Navi Mumbai

Vyoma Mahape

Under construction

30 MW

Kanchipuram

Vyoma Kanchipuram (next module)

Near commissioning

6 MW

Visakhapatnam, Bengaluru, Mumbai

Future campuses

Planned

~200 MW combined target

12. Digital Connexion

Digital Connexion
Digital Connexion is a data center joint venture between Brookfield Infrastructure, Reliance Industries and Digital Realty, formed to build hyperscale and AI-ready capacity in India. Its first facility, MAA10 in Ambattur, Chennai, offers 20 MW of IT load as the first phase of a 100 MW-capable campus on 10 acres.

 

In August 2025, MAA10 received Nvidia's DGX-Ready Data Center certification, making it the first facility in India with that status. The certification means the site is validated to host Nvidia DGX systems for AI training and inference.

 

Digital Connexion plans to invest approximately USD 11 billion by 2030 to develop 1 GW of AI-native data center capacity across a 400-acre site in Visakhapatnam, Andhra Pradesh, following an MoU signed on November 26, 2025.

 

Recent Developments:

  • Nvidia DGX-Ready: MAA10 was certified in August 2025, the first DGX-Ready data center in India.

  • MAA10: 20 MW of IT load live in Chennai.

Upcoming Digital Connexion Data Center Projects in India:

 

Location

Project

Status

Capacity

Chandivali, Mumbai

Digital Connexion Mumbai Data Center

Upcoming

40 MW

Visakhapatnam, Andhra Pradesh

Digital Connexion AI Data Center Campus

Proposed

1 GW

Chennai, Tamil Nadu

MAA10 Campus Expansion

Expansion

100 MW+ campus

 

13. Iron Mountain (Web Werks)

Web Werks India Pvt Ltd
Iron Mountain entered India in 2021 through a joint venture with Web Werks and took full ownership of the company effective April 1, 2025. At acquisition, Web Werks ran six operating data centers in Mumbai, Bengaluru, Hyderabad, Pune and Noida with 14 MW of combined IT capacity, plus 142 MW of planned capacity in Mumbai, Chennai and Noida. Iron Mountain says it will offer 150 MW in India once the data centers under construction are complete.

 

In January 2026, Iron Mountain broke ground on MUM-3, an 85 MW hyperscale campus in Navi Mumbai designed for high-density AI workloads, due to begin operations in 2027. In April 2026, its Chennai CHN-1 data center in Ambattur reached topping out, bringing 23.2 MW of power capacity closer to service; the two-building campus will provide 42 MW at full build, with the first facility expected to go live later in 2026.

 

Globally, Iron Mountain operates about 415 MW of colocation and hyperscale capacity across 21 markets in seven countries, and is listed on the NYSE.

 

Recent Developments:

  • Mumbai MUM-3: Ground broken in January 2026 on an 85 MW AI campus; operations from 2027.

  • Chennai CHN-1: Topped out in April 2026; first facility expected to go live later in 2026.

  • Web Werks: Full ownership took effect April 1, 2025.

Upcoming Iron Mountain Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Navi Mumbai

MUM-3

Under construction (2027)

85 MW

Chennai

CHN-1 campus

Under construction

42 MW at full build

Noida

NCR-1 expansion

Under development

Scalable to 12 MW

14. Equinix

Equinix India Pvt Ltd
Equinix, the world's largest colocation provider, entered India in 2021 by acquiring GPX Global Systems' Mumbai data centers and currently has 20 MW of data center operational capacity in India. It now runs four IBX data centers on its Mumbai campus and one in Chennai, and connects more than 300 companies in India, including network providers and five internet exchanges. Equinix has committed more than USD 365 million to India across Mumbai and Chennai.

 

Equinix opened its first Chennai data center, CN1 in Siruseri, in September 2025 with an initial investment of USD 69 million. CN1 offers 800 cabinets in its first phase and will eventually support 4,250 cabinets, with liquid cooling for AI workloads. In April 2026, it opened its fourth Mumbai data center with an initial investment of more than USD 95 million, linked to its other Mumbai and Chennai sites by dedicated dark fibre.

 

Equinix bought land in Chandivali, Mumbai, for INR 150 crore in December 2024 to expand its Mumbai campus further.

 

Recent Developments:

  • Fourth Mumbai data center: Opened in April 2026 with more than USD 95 million initial investment.

  • Chennai CN1: Opened September 2025; 800 cabinets in phase 1, 4,250 at full build.

  • India investment: More than USD 365 million committed across Mumbai and Chennai.

Upcoming Equinix Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Chennai

CN1 (later phases)

Under development

4,250 cabinets at full build

Mumbai

Chandivali land parcel

Planned

Not disclosed

15. Reliance Industries (Jio)

Reliance Group
Reliance Industries, India's largest private company, has moved into AI data centers through its Reliance Intelligence unit and Jio. In February 2026, Reliance announced a USD 110 billion AI infrastructure investment plan, and in June 2026 it unveiled an AI computing platform in Jamnagar, Gujarat, powered by renewable energy from its Gujarat operations.

 

Reliance plans to commission an initial 120 MW of AI computing capacity at Jamnagar by the end of 2026, using Nvidia GB300 GPUs that it says equal more than 75,000 H100 chips for inference. The platform could scale to more than 200,000 H100-equivalent units once the first phase is fully operational. Separately, Reliance and Meta announced in June 2026 a 168 MW AI data center in Jamnagar, which Reliance will develop and operate for Meta on a built-to-suit basis within two years.

 

Reliance is also a partner in Digital Connexion, its data center joint venture with Brookfield and Digital Realty.

 

Recent Developments:

  • Jamnagar AI platform: First 120 MW of AI compute due for commissioning by end-2026.

  • Meta: 168 MW built-to-suit AI data center in Jamnagar announced in June 2026, due within two years.

  • Investment plan: USD 110 billion AI infrastructure commitment announced February 19, 2026.

Upcoming Reliance Data Center Projects in India:

 

Location

Project

Status

Capacity / Scale

Jamnagar

Reliance Intelligence AI compute platform

Under construction (end-2026)

120 MW initial

Jamnagar

Meta built-to-suit AI data center

Announced

168 MW

Who Is Building Data Centers in India?

Besides the 15 operators above, global hyperscalers, AI cloud companies and Indian conglomerates are building data centers in India. Most of the largest new projects pair a hyperscaler or AI customer with an Indian developer.

Hyperscalers

  • Google: Announced a USD 15 billion, 1 GW AI hub in Visakhapatnam in October 2025, developed with AdaniConneX and Airtel. Construction began in April 2026.

  • Microsoft: Committed USD 17.5 billion to India in December 2025, its largest investment in Asia. Its largest India data center, in Hyderabad, was on track to open around mid-2026, according to Microsoft India's country head.

  • Meta: Leasing a 168 MW built-to-suit AI data center from Reliance in Jamnagar, announced in June 2026.

  • Amazon Web Services: Operates cloud regions in Mumbai and Hyderabad.

AI cloud companies

  • CoreWeave: Entered India in October 2026 with 240 MW at AdaniConneX's Taloja campus in Navi Mumbai.

  • Neysa: Hosting up to 9,000 GPUs at STT GDC's Noida 2 data center from Q1 2027.

Indian conglomerates and new entrants

  • Reliance Industries: 120 MW AI compute platform in Jamnagar due by end-2026, under a USD 110 billion AI plan.

  • Larsen & Toubro: INR 10,000 crore allocated to its Vyoma data center business.

  • Tata Consultancy Services: Reported to be planning a 1 GW HyperVault AI data center in Hyderabad.

AI Data Center Companies in India

Yes, India has AI data centers, and the number is growing quickly. Yotta's 20,736-GPU Blackwell Ultra supercluster at Greater Noida and Reliance's 120 MW Jamnagar platform are among the largest, and the government's IndiaAI Mission buys GPU capacity from private operators such as Yotta.

 

Hyperscalers and AI cloud companies, including Google, Meta, CoreWeave and Neysa, have all committed to large GPU deployments with Indian operators since late 2025.

 

Company

AI or GPU infrastructure

Location

Status

Yotta Data Services

20,736 Nvidia Blackwell Ultra GPUs; Shakti Cloud; IndiaAI Mission supplier

Greater Noida, Navi Mumbai

Go-live targeted August 2026

Reliance Industries

120 MW AI compute with Nvidia GB300 GPUs

Jamnagar

Commissioning by end-2026

AdaniConneX / Google

1 GW AI hub (400 MW phase 1)

Visakhapatnam

Under construction

AdaniConneX / CoreWeave

240 MW AI cloud on Nvidia Vera Rubin

Navi Mumbai

First phase mid-2028

STT GDC India / Neysa

Up to 9,000 GPUs; 45 MW AI-ready Chennai campus

Noida, Chennai

Q1 2027 (Noida)

CtrlS Datacenters

150 MW hyperscale AI factory

Bodh Gaya, Bihar

Letter of intent

Digital Connexion

India's first Nvidia DGX-Ready data center

Chennai

Operational

NTT DATA

USD 1.2 billion AI data center cluster; liquid cooling at NAV2

Navi Mumbai and other sites

Announced

L&T-Vyoma

Nvidia MoU for build-to-suit AI capacity

Kanchipuram, Navi Mumbai

Planned

Trusted by Leading EPCs & Manufacturers

Explore the Latest Insights on the India Data Center Market

Access comprehensive insights into India's data center market, including market size, growth trends, investment opportunities, competitive landscape, key developments, and future outlook.

Request Free Sample Learn More →

No credit card Up-to-date coverage

How many data centers are there in India?

India has more than 150 operational data centers, with additional projects under construction and in the planning and announcement stages. According to the Blackridge data center database, India's operational data center IT capacity reached about 1.78 GW in H1 2026.

Largest Data Centers in India

The largest operational data center campus in India is NTT's NAV2 in Navi Mumbai, a 500 MW facility with 336 MW of IT capacity, which includes what NTT describes as India's largest single-building data center at 50 MW of IT load. The largest project under construction is the 1 GW Google AI hub in Visakhapatnam.

 

Campus

Operator

City

Capacity

Status

Google AI hub

AdaniConneX, Airtel (for Google)

Visakhapatnam

1 GW hub (400 MW phase 1)

Under construction

Chandan Valley campus

CtrlS Datacenters

Hyderabad

612 MW power

Planned

NAV2

NTT DATA

Navi Mumbai

500 MW facility / 336 MW IT

Operational

Taloja campus (CoreWeave)

AdaniConneX

Navi Mumbai

240 MW, option to 480 MW

Under development

D2

Yotta Data Services

Greater Noida

60 MW, scalable to 250 MW

Phase 1 live

Meta AI data center

Reliance Industries

Jamnagar

168 MW

Announced

MU1

Princeton Digital Group

Navi Mumbai

150 MW

Operational / expanding

Conclusion

India's data center market is entering a major growth phase, driven by rising cloud adoption, AI workloads, data localisation requirements and investments from domestic and international technology companies. Operators such as STT GDC India, CtrlS Datacenters, Nxtra by Airtel, NTT DATA and Sify Technologies lead the market by operational IT capacity, while Yotta, AdaniConneX, Digital Connexion and Reliance Industries are expanding their AI-ready infrastructure.

 

India already has more than 150 operational data centers, with operational IT capacity reaching approximately 1.78 GW in H1 2026. Large-scale developments in Visakhapatnam, Mumbai, Chennai, Hyderabad and Navi Mumbai are expected to add substantial capacity over the coming years. As competition intensifies, investments in power infrastructure, liquid cooling, renewable energy, and high-density computing will shape the next phase of market expansion.

Discover Data Center Projects & Tenders before your Competitors Do!

Unlock India's Data Center Opportunities! Introducing Blackridge Research's Global Project Tracking (GPT) platform:

  • Instant access to India's latest Data Center Facility Projects

  • Comprehensive insights from planning to completion

  • Essential details: scope, CapEx, timelines, and key contacts

  • User-friendly interface for quick opportunity identification

Want more data center construction insights, including planned projects, active companies, and key decision-makers? Get started with our project tracker demo today.

Why Blackridge’s Global Projects Tracker?

Blackridge’s Global Projects Tracker covers projects from 150 countries and is updated with real-time, accurate, and authentic project developments. By subscribing to our Indian Data Center projects database, you can get access to key contact details of ongoing and upcoming projects, project timelines and overviews, and regular alerts on project developments, all served to you through an easy-to-use interface.

Frequently Asked Questions

Tags

Leave a Comment

We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.