Project intelligence
- ✓ Scope, phases, and campus context
- ✓ IT load and total power (MW) per phase
- ✓ Investment value, total and per phase
- ✓ Timelines, milestones, and RFS dates
- ✓ Location with coordinates
Discovering and tracking projects and tenders is not easy. With Blackridge Research''s Global Project Tracking (GPT) platform, you can identify the right opportunities and grow your pipeline while saving precious time and money doing it.
PROJECTS
0+
INVESTMENT
$5.96T
REGIONS
24
New project alert
Trusted by 500+ manufacturers, EPC contractors, consultants, investors & technology providers worldwide
Every record answers the questions a bid or no-bid meeting actually asks, and shows its sources.
FULL LIFECYCLE COVERAGE
Most tools see a project at announcement. Each stage is a different buying window, so every record is stage-tagged and alerts fire when a watched project moves.
Project stage
Rumors, government planning, utility inquiries, code-named filings
Engage now: Investors, land brokers, site-selection and power consultants
Project stage
Land acquisition, site selection, feasibility studies
Engage now: Real estate, feasibility and owner's-engineer advisors
Project stage
Zoning, environmental approval, power allocation, grid connection
Engage now: GCs pre-qualify; architects and engineers position for design
Project stage
Investment approval, financial close, sponsor commitments
Engage now: Lenders, insurers, project-finance advisors
Project stage
Designer appointed, basis-of-design set, specifications written
Engage now: Equipment vendors get specified in; long-lead orders start
Project stage
GC and EPC selection, package RFQs, procurement schedules
Engage now: Contractors bid; generator, UPS, switchgear, cooling vendors quote
Project stage
Packages awarded, subcontracting begins
Engage now: Sub-tier suppliers approach winners; competitors recalibrate
Project stage
Civil, shell, then MEP fit-out, with phased expansion in parallel
Engage now: Commissioning agents, O&M providers, retrofit and upgrade suppliers
WHO IT'S FOR
The same database, filtered to the stage and fields each team actually uses. Pick a seat at the table.
Port Authorities and Harbor Masters
Plan safe, cost effective berthing capacity and coordinate harbor changes using verified project data.
Map all planned berth and mooring projects in your region to spot where capacity will grow and where gaps remain.
Compare planned berth length, berth depth and deck elevation to set realistic standards for your next upgrade.
Use project status and timelines to schedule harbor closures and navigational notices with minimal disruption.
Identify projects that will change approach channels so you can plan aids to navigation and pilotage updates early.
Prioritize dredging budgets by filtering projects with new or deeper alongside depths and estimated dredge volumes.
Find funding and grant opportunities by tying your proposal to the documented regional berth expansion pipeline.
Coordinate stakeholders by using owner and contractor contacts in the database to set joint planning meetings.
Build a multi year capital plan based on comparable berth projects listed in the database.
Marine Engineering and Design Firms
Win more design work and reduce rework by matching solutions to documented berth requirements.
Qualify leads fast by filtering projects that need quay walls, dolphins, jetties or floating pontoons within your service area.
Use available specs like target vessel class, berth length, water depth and fender energy to prepare concept designs that match the brief.
Shortlist design codes and standards by checking whether the owner references PIANC, BS or Eurocode in the project notes.
Improve win rates by aligning your scope with the stated procurement route such as design build, EPC or consultant led design.
Plan staffing by matching project phases in the database to your internal design schedule from concept to IFC deliverables.
Reduce design risk by reviewing metocean and geotechnical notes tied to the project so your loads and details are realistic.
Create persuasive proposals by citing nearby reference projects from the database with similar mooring layouts and soil conditions.
Dredging and Marine Construction Contractors
Build a qualified bid pipeline and price marine works with better accuracy.
Build a targeted bid pipeline by tracking berth and jetty projects that include piling, dredging, scour protection and revetments.
Estimate quantities early by using listed berth depths, footprint areas and channel dimensions to prepare order of magnitude takeoffs.
Plan equipment allocation by matching project water depth and access constraints to your dredgers, barges and cranes.
Improve pricing accuracy by reviewing quay wall type, pile sizes, dolphin count and fender systems noted in the project outline.
Time your market entry by watching status changes from concept to tender to award so you meet prequalification deadlines.
Win more work by contacting owners and EPCs listed for each project with targeted capability statements and case studies.
Manage risk by flagging projects with contaminated sediments or rock dredging so you can prepare the right methods.
Coordinate partners by finding local marine subcontractors and suppliers mentioned in the project details to form stronger teams.
Optimize logistics by using project notes, where provided, on laydown areas, casting yards and temporary moorings.
Terminal Operators and Port Developers
Plan expansions, manage risk and align operations with the future berth pipeline.
Discover expansion sites by filtering projects that add container, bulk, LNG, RoRo or cruise berths that align with your cargo mix.
Benchmark competitive moves by tracking rival terminals with planned berth extensions, new mooring dolphins and ramp upgrades.
Validate vessel strategy by checking planned berth depth and berth length to confirm future calls of larger ships are feasible.
Support concession bids by referencing the regional berth project pipeline to show demand and network growth.
Align procurement plans by noting when projects shift to tender so your operations team can prepare equipment and staffing.
Improve ROI models by using typical construction durations and phasing from comparable projects in the database.
Reduce commissioning risk by reviewing interface items like utilities, bunkering and gangway systems listed in project scopes.
Mooring Equipment and Fender Suppliers
Find live specs and timelines to size, price and deliver the right mooring systems.
Target the right projects by filtering for fender type, energy rating, bollard capacity and quick release hook requirements.
Size your offer quickly by using stated berth length, panel spacing and tidal range to propose a compliant fender layout.
Secure early position by contacting owners and designers at concept stage to influence fender selection and layout.
Improve manufacturing planning by aligning production slots to project delivery windows and shipment routes listed in the database.
Increase conversion by matching your certifications and testing standards to the standards called for in the project brief.
Reduce returns by confirming allowable reactions on quay structures from the database specs before finalizing panels and chains.
Offer value engineering by comparing similar berth projects and suggesting proven fender and hook configurations.
Expand after sales revenue by tracking maintenance windows for existing berth refurbishments that need pad or anchor replacements.
Build distributor networks by identifying projects in new countries and the local partners named in project summaries.
Speed approvals by attaching performance curves and anchor load data that align with the database design vessel and metocean notes.
Shipping Lines and Network Planners
Plan network growth around new berthing capacity and reduce call uncertainty.
Plan future port rotations by seeing when new berths will open and what vessel classes they are designed to handle.
Reduce schedule risk by checking planned draught and air draft at new berths so your fleet can call without delays.
Align alliances by tracking terminal expansions that add berth windows for your service strings.
Improve bunker and service planning by noting new moorings with LNG, shore power or freshwater listed in project scopes.
Support commercial decisions by sharing verified berth timelines with sales teams to build early cargo commitments.
Investors and Infrastructure Funds
Originate, assess and monitor berth projects with clear risk and schedule insight.
Source deals by scanning greenfield and brownfield berth projects with clear sponsors, timelines and estimated scope.
Rank opportunities by comparing project readiness from feasibility to financial close using the database status tags.
Strengthen investment memos by citing nearby reference projects with similar quay types, dredging needs and cost drivers.
Improve risk screening by flagging projects with complex permitting, sensitive habitats or significant dredge volumes.
Engage earlier by using owner and advisor contacts to set discovery calls before formal tenders launch.
Model returns more confidently by using realistic construction durations and phasing drawn from comparable projects.
Monitor counterparties by tracking EPC shortlists and award outcomes to gauge execution capability.
Build ESG narratives by linking habitat protection measures and community benefits listed in project descriptions to your policy.
Environmental and Permitting Consultants
Win scoped work and guide approvals with early visibility of projects and constraints.
Find projects early by filtering for berths that require EIAs, ESIA updates or dredge disposal permits in your jurisdictions.
Prepare robust scopes by noting sensitive receptors such as reefs, mangroves and fisheries mentioned in project notes.
Speed approvals by aligning mitigation measures like silt curtains, turbidity limits and timing windows with project schedules.
Reduce rework by checking whether baseline studies, noise modeling and sediment testing are already completed.
Coordinate agencies by using listed regulator contacts to plan joint site visits and submission timelines.
Win more work by proposing staged deliverables that fit the project status from screening to scoping to full assessment.
Hydrographic and Geotechnical Survey Companies
Propose the right surveys at the right time with clear scope context.
Time your outreach by contacting owners when projects move from concept to survey so you can propose the right methods.
Tailor survey proposals by using planned berth depth, approach channel width and vessel class to select survey lines and coverage.
Reduce mobilization costs by grouping nearby projects from the database into one vessel campaign.
Improve safety by checking notes on currents, wave climate and traffic constraints before sailing to site.
Fill data gaps by proposing CPT, boreholes and lab tests that match the quay wall type and pile design noted in the project.
Speed processing by aligning deliverables such as multibeam grids, sediment cores and geophysics with tender needs.
Add value by recommending UXO or obstruction surveys where historic data in the database suggests higher risk.
Maritime Software and Technology Providers
Sell proven tools by integrating reliable berth data into planning and operations.
Enrich berth planning tools by importing new berth coordinates, dimensions and depths to improve ETA and window predictions.
Build digital twins by linking project phases to asset models so owners can track progress from design to handover.
Offer sensor packages by targeting refurbishments that plan bollard load monitoring or fender wear tracking.
Improve pilotage and VTS solutions by mapping new moorings and aids so traffic modules reflect future layouts.
Accelerate sales by contacting decision makers on projects with a clear technology scope so you join the budget early.
CONTACTS
Verified contacts attached to real projects: the development director at the owner, the procurement lead at the GC, the engineering lead at the consultant. Each one is confirmed by a researcher, then re-verified as the project advances.
Director of Procurement
Meridian Build Group
Singapore
VP, Development
Northgate DC Partners
Dallas, TX
Head of Engineering
Nordvik Colo
Stockholm, SE
Project Finance Lead
Granton Infrastructure
London, UK
Sample profiles. Real names and outreach details unlock with a subscription, and the relevant contact changes by stage, so records are re-verified as a project advances.
No manual data entry, no missed opportunities. Flexible licensing for internal tools, customer products, analytics platforms, or enterprise applications.
Push discovered projects, stakeholder contacts, and deal opportunities directly into HubSpot the moment they surface.
Map global projects to Salesforce opportunities in real time. Enrich records with procurement timelines, budgets, and verified contacts.
Automatically create leads, accounts, and contacts in Zoho enriched with project stage, budget, and procurement intelligence.
Don't see your tool? Request an integration →
One package covers all endpoints — projects, contacts, tenders, and stakeholders.
Pass your API key at initialization. Supports environment variables out of the box.
Filter by sector, stage, country, value range and more than 40 fields.
Every response already contains stakeholders, contacts and tender data.
Recent Intelligence
DEME orders new offshore construction vessel with DP2 system to boost subsea cable installation for growing offshore wind market demands.
WHY TIMING DECIDES
Global Berth (Mooring) Facility Projects Database owners are among the most secretive buyers in Infrastructure. By the time a project is public, most of its budget is already committed.
Hyperscalers buy land through shell companies and file permits under code names. A campus can be well over a year into development before its end user is confirmed. If your pipeline runs on press releases, you are last to know.
GCs are appointed before ground-breaking, and long-lead equipment is ordered 12 to 24 months before delivery. By the time steel is visible from the highway, most of the contract value is already committed.
The rest lives in planning filings, permits, grid queues, and tender portals across dozens of languages. English keyword alerts were never going to find a permit filed in Bahasa Malaysia.
long-lead window for transformers and large generators, so early visibility decides whether you quote or decline
of contract value typically committed before construction is visible from the road
countries of permit, grid, and tender portals in dozens of languages, between you and a complete pipeline
per week a BD manager spends scanning news, LinkedIn, and portals, per market
WHAT'S INSIDE
Every field is sourced from primary filings in the local language and verified before it reaches your dashboard.
Analysts read municipal filings, environmental approvals, and tender portals in the local language, with every record citing its source document.
Gross and IT MW captured per phase so a campus in Malaysia compares directly with one in Ireland.
Announced capital expenditure converted to USD, with the local-currency figure and conversion date retained.
Named owner, developer, and EPC contacts in every market, re-verified on a rolling 90 day cycle.
Open tenders, shortlists, and awarded packages linked to the project they belong to.
Push new and updated projects straight into your CRM so the pipeline reaches the team that works it.
HONEST COMPARISON
Discovery is now a solved, subscribable problem. Deal selection and relationships are not.
| Capability | Manual research | News alerts | Contact databases | Generic construction DBs | This database |
|---|---|---|---|---|---|
| Pre-announcement discovery | Possible, costly | No | No | Rare | Permits, filings, primary research |
| Berth Mooring Facility fields (MW, type, stage) | Build it yourself | No | No | Partial | Native |
| Verified decision-maker contacts | Slow | No | Titles only, unverified | Generic | Researcher-verified, by stage |
| Tender and award tracking | Sporadic | Keyword luck | No | Partial | Systematic, every tracked market |
| Change alerts on specific projects | No | Keyword noise | No | Limited | Project and field level |
| Local-language coverage | Rare | Poor | Poor | Varies | Regional analysts, native language |
| Structured export, API, CRM | Manual | No | Limited | Some | Excel, REST API, Salesforce, HubSpot |
| Institutional memory | Leaves with the employee | None | None | Partial | Permanent, shared, auditable |
| Annual cost | Loaded cost of a researcher | Free plus hidden hours | Per seat | Mid | A fraction of one hire |
| Manual research | Possible, costly |
|---|---|
| News alerts | No |
| Contact databases | No |
| Generic construction DBs | Rare |
| This database | Permits, filings, primary research |
| Manual research | Build it yourself |
|---|---|
| News alerts | No |
| Contact databases | No |
| Generic construction DBs | Partial |
| This database | Native |
| Manual research | Slow |
|---|---|
| News alerts | No |
| Contact databases | Titles only, unverified |
| Generic construction DBs | Generic |
| This database | Researcher-verified, by stage |
| Manual research | Sporadic |
|---|---|
| News alerts | Keyword luck |
| Contact databases | No |
| Generic construction DBs | Partial |
| This database | Systematic, every tracked market |
| Manual research | No |
|---|---|
| News alerts | Keyword noise |
| Contact databases | No |
| Generic construction DBs | Limited |
| This database | Project and field level |
| Manual research | Rare |
|---|---|
| News alerts | Poor |
| Contact databases | Poor |
| Generic construction DBs | Varies |
| This database | Regional analysts, native language |
| Manual research | Manual |
|---|---|
| News alerts | No |
| Contact databases | Limited |
| Generic construction DBs | Some |
| This database | Excel, REST API, Salesforce, HubSpot |
| Manual research | Leaves with the employee |
|---|---|
| News alerts | None |
| Contact databases | None |
| Generic construction DBs | Partial |
| This database | Permanent, shared, auditable |
| Manual research | Loaded cost of a researcher |
|---|---|
| News alerts | Free plus hidden hours |
| Contact databases | Per seat |
| Generic construction DBs | Mid |
| This database | A fraction of one hire |
Trust in a database comes from methodology, not marketing. This is how a record is built, and why you can stake a bid on it.
Analysts assigned by region and languages continuously monitor every source layer. A permit filed in Bahasa Malaysia or a tender in Brazilian Portuguese is not caught by English keyword scraping; it is caught by the person whose job is that market. Automated monitoring flags candidate signals, and researchers qualify them.
Every material fact (capacity, investment, dates, stakeholders) must reconcile across at least two independent sources, with primary documents outranking press coverage. Conflicts are flagged rather than averaged, and estimates are labeled as estimates.
For significant projects and all contact data, researchers confirm directly with project stakeholders. This is where code-named projects get connected to their real owners, the step no automated pipeline performs.
Re-check cycles are tiered by stage, with active projects checked most often. Every record carries its sources and a last-verified timestamp, and watched projects trigger alerts on any change.
Find more opportunities across different regions in this sector and explore other industries we cover in this region.
FAQ
The Global Project Tracker is a comprehensive database about construction projects around the world covering all phases of development.\n\nWe find and track projects from the inception stage to completion encompassing all the major industry sectors.\n\nEach project profile includes details, such as the project description, status, scope, size, value, funding mode, location, major event dates, and milestones, as well as contact details of the project owner, contractors, and stakeholders.
The database is updated daily, with new projects and tenders being added and updated in a timely manner. \n\nTo make sure you have the most recent information, you should check the database often and sign up for alerts that will let you know about new projects and tenders that match your criteria.
No, the database includes both new construction projects (greenfield projects) and expansions, renovations, and upgrades to existing structures (brownfield projects).
Yes, the database allows users to search for projects by location, so you can easily find berth (mooring) facility projects and tenders in your area of interest.
No, the database is for anyone interested in the construction industry. This includes manufacturers and suppliers, EPC companies/Developers/Contractors, banks and insurance companies, asset management, operation and maintenance (O&M) companies, logistics and warehousing firms, consulting companies, law firms, and investors, among others.
If you are interested in subscribing to the Global Project Tracker, please contact our sales team via email or our contact form.\n\nIf you tell us more about your requirements and goals, our team will make a proposal that fits your needs. Once you accept our proposal and complete the payment, we will send you login credentials to access the platform.\n\nA customer success specialist will also be available to show you how to use the platform, and a research analyst will be assigned to help you with any questions or problems that may come up during the active subscription period.
You will need to send an email to [email protected] to submit a tender in our database. \n\nOur team will share the submission guidelines to ensure your tender is live in our database.
The cost of Global Project Tracker subscription varies based on factors like the number of users, regions, sectors, project development stages, and additional features or services included in the package.\n\nContact our sales team for personalized pricing options and to choose the ideal package for your requirements.
Yes, it is possible to add more users to your subscription anytime. \n\nFor each extra user you add to your subscription, you will usually have to pay a per-user fee.