Project at a Glance | |
Project Name | Rosmari Marjoram Gas Project |
Project Type | Deepwater sour gas development |
Project Status | Under construction |
Project Location | Block SK318, offshore Sarawak |
Operator | Sarawak Shell Berhad (SSB), a Shell subsidiary |
Onshore Plant Capacity | 800 MMscf/d processing capacity (OGP-1) |
Design Life | 20 years |
Project Overview
Rosmari Marjoram is a pair of deepwater sour gas fields discovered by Shell in 2014 in Block SK318, about 220 km off Bintulu in Sarawak. Sarawak Shell Berhad operates the block with an 80% interest, and Petronas Carigali holds 20%.
The development has three parts: a remotely operated wellhead platform with a subsea tie-back, a pipeline of about 207 km that carries sour wet gas to shore, and an onshore gas plant at Bintulu with 800 MMscf/d of nameplate processing capacity. Treated gas will feed the Petronas LNG Complex at Bintulu.
Shell describes the platform as primarily solar-powered, with 240 solar panels and diesel and battery backup. The onshore plant draws on the Sarawak grid, which is mainly hydroelectric, supported by Renewable Energy Certificates.
The project is the first phase of Sarawak Integrated Sour Gas Evacuation System (SISGES). Petronas says the scheme is designed to unlock more than 10 tcf of high-contaminant gas off Sarawak, and that Rosmari-Marjoram is expected to be a catalyst for developing further sour gas resources.
Rosmari Marjoram Project Location
The Rosmari Marjoram Project is located offshore Sarawak, Malaysia, in Block SK318, approximately 220 km off the coast of Bintulu in the South China Sea.
From the offshore fields, gas is transported through a 207 km sour wet-gas pipeline to the project’s onshore gas plant at Bintulu, Sarawak.
Project Background
Shell drilled Rosmari-1 in April 2014 and found a gas column of more than 450 m, followed by the Marjoram-1 discovery in August 2014. Both are deepwater sour gas discoveries in Block SK318, which Sarawak Shell holds under a 27-year production sharing contract. Perunding Ranhill Worley was awarded the offshore FEED (Front-End Engineering Design) in May 2020.
Samsung Engineering received the onshore EPCC award in July 2022, with limited first-phase works allowed ahead of Final Investment Decision (FID). Sarawak Shell and Petronas Carigali announced FID on 5 September 2022.
Malaysia Marine and Heavy Engineering (MMHE) received the platform Engineering, Procurement, & Construction (EPC) contract in October 2022, with the unmanned platform to be built with a four-legged jacket for 140 m of water.
Rosmari Marjoram Project Current Status
The Rosmari Marjoram Project is in the construction phase, with first gas expected by the end of 2026.
Stakeholder Details
Stakeholder | Role |
Sarawak Shell Berhad (Shell) | Operator; 80% interest |
Petronas Carigali | 20% interest |
Petronas LNG Complex | Offtaker |
Samsung Engineering | Onshore Plant EPCC |
MMHE (MHB) | Offshore Platform EPC |
OceanMight (KKB Engineering) | Onshore Plant Modules |
Trusted by Leading Manufacturers & EPCs
Find The Latest Oil & Gas Projects In Malaysia
Gain exclusive access to our industry-leading database of Oil & Gas Project opportunities with detailed project timelines & stakeholder information
No credit card Up-to-date coverage
Rosmari Marjoram Project Cost
The total estimated cost for the Rosmari Marjoram Project is not disclosed officially.
Project Timeline
Year | Event |
2026 | Rosmari Marjoram project expects its first gas. |
21 September 2023 | Onshore plant groundbreaking in Bintulu |
October 2022 | MMHE awarded offshore platform EPC |
5 September 2022 | FID by Sarawak Shell and Petronas Carigali |
July 2022 | Samsung Engineering onshore EPCC award |
April-August 2014 | Rosmari-1 and Marjoram-1 discoveries |
Design & Engineering Details
Resource Type | Deepwater Sour gas |
Onshore Plant Capacity | 800 MMscf/d processing capacity |
Offshore Platform | Unmanned wellhead platform; topside, four-legged jacket and piles |
Platform Power | 240 solar panels; diesel generators and batteries as backup |
Pipeline | About 207 km sour wet gas pipeline to the Bintulu onshore plant |
Conclusion
The Rosmari Marjoram Project is a strategically important deep-water sour-gas development project designed to produce up to 800 MMscf/d of gas, supporting sustained feedgas supply to the Petronas LNG Complex in Bintulu.
Its use of a remotely operated unmanned platform and solar-powered offshore facilities reflects a focus on remote operations and lower-carbon development. Once operational, Rosmari Marjoram will strengthen Sarawak’s gas infrastructure and contribute to Malaysia’s LNG production capacity.
Track the Latest Oil & Gas Projects In Malaysia
Subscribe to our upcoming and ongoing Oil & Gas Projects in Malaysia with ease to access reliable, high-quality insights on forthcoming and completed Projects across the country.
Our user-friendly platform provides essential details, timely updates, key stakeholder contact information, and business opportunities tailored for engineering companies, industry professionals, investors, and government agencies.
Start a free demo to take your business to the next level.
Leave a Comment
We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.
We read every comment and do our best to respond to them all.