Project at a Glance | |
Project Name | PORTS Pike Technology Campus |
Project Type | AI data center campus with dedicated new gas generation and new 765-kV transmission |
Project Status | Early Implementation Phase |
Project Location | Piketon, Pike County, Ohio |
Developer | SB Energy |
Tenant | OpenAI: 20-year lease signed August 2026 |
IT Capacity | 8.0 GW IT in 17 buildings |
Gross Power Load | About 10 GW |
Power Generation | At least 9.2 GW of natural gas generation |
Timeline | First 800 MW in 2028; full build-out expected by 2032 |
Project Overview
The PORTS Pike Technology Campus is designed as 17 data center buildings with 8.0 GW-IT of critical IT capacity, or about 10 GW of gross power load, on the retired Portsmouth enrichment site and adjacent private land. SB Energy leased the site to OpenAI under a 20-year term in August 2026, and NVIDIA is the exclusive AI compute provider. The Permitting Council describes it as the world's largest AI data center.
The first phase of about 800 MW is targeted for 2028 and relies largely on existing AEP infrastructure. Later phases depend on new gas plants, a new 765-kV transmission line, and a gas pipeline.
SB Energy says it will pay for the grid upgrades. NVIDIA says it provides credit support for land, power, and shell buildout, with an option on the remaining 3.75 IT-GW beyond the initial 4.25 IT-GW.
The development is projected to create substantial local economic activity, with estimates ranging from 26,000 construction jobs, alongside approximately 2,500 long-term operating jobs.
The project also includes a USD 80 million community benefits fund, supported by SB Energy and OpenAI, intended to fund locally identified priorities such as schools, roads, and public resources.
Capacity Breakdown
Measure | Amount |
Initial NVIDIA-supported deployment | 4.25 IT-GW |
Optional expansion | 3.75 IT-GW |
Total planned AI-factory capacity | 8 IT-GW |
First construction/energization phase | About 800 MW |
Ports Pike Technology Campus Location
The PORTS-Pike Technology Campus is located in Piketon, Pike County, Ohio, on and adjacent to the former Portsmouth Gaseous Diffusion Plant (PORTS). The campus is located in the Piketon area of Pike County, south-central Ohio, near the Scioto River, approximately 20 miles north of Portsmouth and about 70 miles south of Columbus.
Technical Specifications
Critical IT Capacity | 8.0 GW-IT |
Gross Power Load | About 10 GW; covers about 9,570 MW of additional data center demand and more than 10,000 MW of proposed generation |
Transmission | About 50 miles of 765-kV line to the Gavin Substation near Cheshire |
Cooling & Water | Closed-loop, air-cooled; uses DOE's existing site water system; project to fund new water infrastructure |
Compute | NVIDIA full-stack AI factory platform (GPUs, CPUs, networking); only NVIDIA compute on site |
Project Background
The campus is on the former Portsmouth Gaseous Diffusion Plant, a retired DOE uranium enrichment site. SB Energy's S-1 says the site sits on a retired industrial load, so transmission capacity was available partly because the plant retired. The public-private partnership among SB Energy, SoftBank, DOE, the Department of Commerce, and AEP Ohio was announced earlier in 2026.
The Permitting Council announced FAST-41 coverage on 16 June 2026, making it the first project in the high-performance computing sector. In July, the Ohio EPA deemed SB Energy's Section 401 water-quality certification filing incomplete and requested more information; this was not a denial.
On 17 August 2026, OpenAI, NVIDIA and SB Energy announced that OpenAI would take the campus under a 20-year lease, with NVIDIA investing USD 1.5 billion in SB Energy. SB Energy has since publicly filed an S-1 that lists PORTS as all of its contracted-but-not-under-construction data center capacity and a substantial majority of its roughly USD 439 billion backlog.
Ports Pike Technology Campus Current Status
As of November 2026, the PORTS-Pike Technology Campus is in the early implementation phase. Initial clearing and grading work for Phase 1 began in October 2026.
The broader project is planned to be delivered in phases, with the first 800 MW phase expected to begin in 2026 and capacity anticipated to come online in phases from 2028. The full build-out is expected by 2032.
Stakeholder Details
Stakeholder | Role |
|
SB Energy | Developer, owner and operator |
|
SoftBank Group | Parent and builder |
|
OpenAI | Tenant |
|
NVIDIA | Compute provider and investor |
|
U.S. Department of Energy and Department of Commerce | Land Owner & Federal Partner |
|
AEP Ohio | Transmission Developer |
|
PJM Interconnection and FERC | Grid Operator & Federal Regulator |
|
Ports Pike Technology Campus Cost & Investment Details
Category | Cost |
Gas Generation Investment | USD 33 billion |
Grid Investment | USD 5.1 billion |
NVIDIA and OpenAI support | NVIDIA invests USD 1.5 billion in SB Energy |
Community Benefit Fund | USD 80 million |
Project Scope
The following is the project scope of the Ports Pike Technology Campus:
AI compute infrastructure: NVIDIA is the exclusive AI compute-infrastructure provider, supplying the full-stack DSX AI-factory platform, including GPUs, CPUs, and networking. The initial deployment is designed to support 4.25 IT-GW of AI-factory capacity.
New power generation: The project includes approximately 9.2 GW of new natural-gas generation to supply the campus and support regional electricity needs.
Transmission and grid upgrades: The scope includes high-voltage transmission infrastructure developed with AEP Ohio, estimated at USD 5.1 billion.
Water and cooling systems: The data center is planned to use closed-loop, air-cooled systems that recirculate water rather than continuously consuming it through cooling towers.
Project Timeline
Year | Event |
2032 | Full build-out expected |
2028 | First 800 MW Targeted |
Q1 2027 | Planned construction start for PORTS Energy Center and Energy Center II first phase |
29 January 2027 | Target completion of federal environmental review and permitting |
28 September 2026 | FAST-41 Executive Director extends Corps dates for the environmental assessment |
17 August 2026 | OpenAI, NVIDIA and SB Energy announce 8 GW-IT lease and USD 1.5 billion NVIDIA investment |
16 June 2026 | FAST-41 coverage announced |
Benefits
The following are the benefits of the project:
Local economic impact: The campus is expected to generate substantial local tax revenue and economic activity in Pike County and Southern Ohio. This includes direct investment in construction, operations, infrastructure, and community programs.
Employment Opportunities: The project is expected to create approximately 26,000 construction jobs and about 2,500 long-term operating jobs.
Community benefits fund: The project includes a USD 80 million community benefits fund supported by SB Energy and OpenAI. The fund is intended to support locally identified priorities such as schools, roads, and other public resources.
New power generation: The project includes approximately 9.2 GW of new natural-gas generation. It will supply the campus and support regional electricity needs, with funding in part through the U.S.–Japan Strategic Trade and Investment Agreement and ownership by the U.S. government.
Improved grid reliability: The project includes high-voltage transmission infrastructure intended to connect the campus to the grid, improve reliability, and support the surrounding region.
Conclusion
The PORTS Pike Technology Campus is a major AI, advanced-computing project, designed to combine large-scale data centers, new power generation, and transmission upgrades on private and remediated Department of Energy land at the former PORTS site.
The facility is expected to bring multiple benefits, including generating thousands of construction and long-term operating jobs, new tax revenue, workforce development, along with a USD 80 million community benefits fund.
It is positioned as a long-term investment in U.S. AI leadership and Southern Ohio’s economic future. By reindustrializing a former federal site and building advanced AI infrastructure, the project aims to create jobs, support local communities, and strengthen the region’s role in the next generation of digital infrastructure.
Track the Latest Data Center Projects In The United States
Subscribe to our upcoming and ongoing Data Center Projects in the United States with ease to access reliable, high-quality insights on forthcoming and completed Projects across the country.
Our user-friendly platform provides essential details, timely updates, key stakeholder contact information, and business opportunities tailored for engineering companies, industry professionals, investors, and government agencies.
Start a free demo to take your business to the next level.
Leave a Comment
We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.
We read every comment and do our best to respond to them all.