Project at a Glance | |
Project Name | FPSO SEAP II (P-87) |
Development Project | Sergipe Deepwater (SEAP) |
Project Status | Contract Signed |
Field/Reservoirs | Budião, Budião Noroeste and Palombeta fields — light oil reservoirs |
Project Location | Sergipe-Alagoas Basin, offshore northeastern Brazil |
Operator | Petrobras |
Contract Model | Build, Operate and Transfer (BOT) |
Hull Design | SBM Offshore Fast4Ward® programme |
Oil Production Capacity | 120,000 barrels-per-day oil |
First Oil Target | 2030 |
O&M Contract Period | Initial 6.5 years |
Project Overview
FPSO SEAP-II (P-87) is a Floating Production, Storage, & Offloading (FPSO) vessel. It has an oil production capacity of 120,000 barrels per day (bopd), built by SBM Offshore for Petrobras' Sergipe Deepwater (SEAP) project, offshore northeastern Brazil. The contract was signed on 29 May 2026, alongside a sister contract for FPSO SEAP-I (P-81).
SEAP-II will develop light oil reservoirs in the Budião, Budião Noroeste, and Palombeta fields, located approximately 80 km offshore within the BM-SEAL-4, BM-SEAL-4A, and BM-SEAL-10 concessions. First oil is targeted for 2030, with gas exports beginning in 2031.
SEAP-II's technical specification centres on a 120,000 bopd oil production capacity, gas treatment capacity of 425 million standard cubic feet per day (approximately 12 million cubic metres per day), and water injection capacity of 120,000 barrels per day.
It is built under the Build, Operate and Transfer (BOT) contract model. SBM Offshore is responsible for the design, construction, and installation of both vessels, and will then operate them under separate Operations and Maintenance contracts for an initial period of 6.5 years. Both FPSOs are built on SBM Offshore's proprietary Fast4Ward® programme, incorporating the company's 11th (P-81) and 12th (P-87) new-build Multi-Purpose Floater hulls.
FPSO SEAP II Location
The FPSO SEAP II will be deployed in the Sergipe‑Alagoas Basin offshore northeastern Brazil. It is about 80 kilometers from the coast in water depths of approximately 2,500 meters. It will develop the Budião, Budião Noroeste, and Palombeta fields, within the BM‑SEAL‑4, BM‑SEAL‑4A, and BM‑SEAL‑10 concessions, targeting high‑quality light oil and non‑associated gas reserves in this new deepwater production frontier for Brazil’s Northeast region.
SEAP I & SEAP II Comparison
Category | SEAP I | SEAP II |
Oil Capacity | 120,000 bopd | 120,000 bopd |
Gas Treatment | 355 MMscfd | 425 MMscfd |
Water Injection | 200,000 bpd | 120,000 bpd |
Water Depth | 2,500 m | 2,500 m |
Distance Offshore | 100 km | 80 km |
Fast4Ward Hull | 11th MPF Hull | 12th MPF Hull |
First Oil Target | Beyond Petrobras’ 2026-2030 Business Plan horizon (2031+) | 2030 |
Gas Export Start | Not specified | 2031 |
Reservoirs | Not specified | Budião, Budião Noroeste, and Palombeta fields |
Also Read: Albacora P 88 FPSO: Latest Updates (2026)
Technical Specification
FPSO Type | New-build FPSO |
Oil Production Capacity | 120,000 barrels of oil per day (bopd) |
Gas Treatment Capacity | 425 million standard cubic feet per day (MMscfd) / approximately 12 million cubic metres per day |
Water Injection Capacity | 120,000 barrels per day |
Water Depth | Approximately 2,500 metres |
Mooring | Spread Mooring |
Gas Export Infrastructure | Direct export pipeline to shore |
Target Reservoirs | Budião, Budião Noroeste and Palombeta — light oil fields |
Concessions | BM-SEAL-4 (Petrobras 75% + ONGC Campos 25%), BM-SEAL-4A (Petrobras 100%), BM-SEAL-10 (Petrobras 100%) |
O&M Contract Term | Initial 6.5 years — SBM Offshore operations and maintenance |
Project Background
Petrobras structured the Sergipe Deepwater development as a two-module programme: SEAP I and SEAP II, each requiring its own dedicated FPSO. Recognising that negotiating both FPSO contracts jointly, with a single contractor, could capture meaningful cost synergies and economies of scale relative to running two separate, sequential tenders.
Petrobras pursued a combined procurement approach, investigating feasibility studies with its key equipment suppliers before formally initiating the BOT contracting process for both platforms together.
Petrobras took the Final Investment Decision (FID) for the SEAP II module in December 2025, consolidating the Sergipe Deepwater development's path to construction. SBM Offshore was selected as the contractor for both SEAP FPSOs, and the contract was formally signed on 29 May 2026, following partner approvals and Petrobras' internal governance procedures.
The combined contract for both vessels represented one of the largest single FPSO contract awards of 2026 globally. It reinforces SBM Offshore's position as Petrobras' most consistently selected FPSO partner, alongside its parallel, concurrent execution of FPSO Jaguar for ExxonMobil's Guyana Whiptail development.
Trusted by Leading Manufacturers & EPCs
Find The Latest FPSO Project In Brazil
Gain exclusive access to our industry-leading database of FPSO Project opportunities with detailed project timelines & stakeholder information
No credit card Up-to-date coverage
FPSO SEAP II Current Status & Completion Date
As of September 2026, FPSO SEAP II (designated P‑87) is under contract and in the early execution phase for Petrobras’ Sergipe Deepwater Project. Petrobras approved the Final Investment Decision (FID) for SEAP II in December 2025, and in May 2026 awarded SBM Offshore a 20‑year Build‑Operate‑Transfer (BOT) contract to design, build, and operate the unit.
First oil is scheduled for 2030, with gas export expected from 2031, meaning the vessel is currently in the design/build stage with no installation or production yet underway.
Stakeholder Details
Stakeholder Role | Individual/Organisation |
Operator/Owner | Petrobras |
FPSO Builder/Operator | SBM Offshore N.V. (Netherlands) |
Regulatory Authority | ANP (Agência Nacional do Petróleo, Gás Natural e Biocombustíveis) |
Environmental Authority | IBAMA (Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis) |
FPSO SEAP II Project Cost Details
The total estimated cost for FPSO SEAP II is not disclosed officially. However, Petrobras confirmed the combined program investment of over R$ 60 billion (USD 12 billion) and the BOT contract with SBM Offshore for two FPSOs.
Project Timeline
Year | Event |
2031 | Gas export expected to begin from SEAP-II |
2030 | First oil production target |
29 May 2026 | Petrobras signs contracts with SBM Offshore for SEAP FPSO’s |
December 2025 | Petrobras announces Final Investment Decision (FID) for the SEAP II |
Conclusion
The SEAP II project marks a strategic expansion project for Petrobras’ offshore portfolio into the Sergipe‑Alagoas Basin, establishing a new deepwater production hub in Brazil’s Northeast. Petrobras has locked in a clear development path with defined capacity, timelines, and gas‑handling capabilities.
SEAP II spotlights a repeatable model for large offshore projects: standardized FPSO specifications, long‑term BOT contracts, and coordinated pairing with SEAP I to optimize infrastructure and cost.
The 120,000 bopd oil capacity combined with substantial gas processing and water injection capacity positions the project to maximize recovery while supporting Brazil’s broader gas‑utilization and decarbonization goals.
Read Next: BW Maromba FPSO: Latest Updates (2026)
Track the Latest & Upcoming FPSO Projects In Brazil
Subscribe to our upcoming and ongoing FPSO Projects in Brazil with ease to access reliable, high-quality insights on forthcoming and completed Projects across the country.
Our user-friendly platform provides essential details, timely updates, key stakeholder contact information, and business opportunities tailored for engineering companies, industry professionals, investors, and government agencies.
Start a free demo to take your business to the next level.
Leave a Comment
We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.
We read every comment and do our best to respond to them all.