Project at a Glance | |
Project Name | SEAP I (FPSO P81) |
Development Project | Sergipe Deepwater (SEAP) |
Project Status | Early Construction Phase |
Project Location | Sergipe-Alagoas Basin, offshore northeastern Brazil |
Operator | Petrobras |
Concessions | BM-SEAL-4, BM-SEAL-4A and BM-SEAL-10 |
FPSO Builder | SBM Offshore N.V. (Netherlands) |
Contract Model | Build, Operate and Transfer (BOT) |
Hull design | SBM Offshore Fast4Ward® programme |
Oil Production Capacity | 120,000 barrels of oil per day (bopd) |
Gas Treatment Capacity | 355 million standard cubic feet per day (MMscfd) |
Project Overview
FPSO P81 (SEAP I) is a Floating Production, Storage & Offloading Vessel developed by SBM Offshore as the first of two modules for the Sergipe Deepwater (SEAP) project in the Sergipe-Alagoas Basin. It has an oil production capacity of approximately 120,000 barrels per day.
The contract was formally signed on May 29, 2026, alongside the sister SEAP-II (P-87) contract, with first oil production expected in 2031. While SEAP II reached Final Investment Decision in December 2025, SEAP I didn’t reach its FID until April 2026. SBM Offshore was awarded both under the same Build, Operate and Transfer (BOT) framework.
Petrobras-led consortia own the vessels from construction, while SBM Offshore designs, builds, installs, and operates each for an initial 6.5-year period under separate Operations and Maintenance contracts.
Both vessels are built on SBM Offshore's Fast4Ward® programme; P-81 uses the company's 11th new-build Multi-Purpose Floater hull, immediately preceding the 12th hull used for SEAP-II (P-87). It was the same standardised hull platform SBM has used for its recent Búzios and Guyana deliveries, including FPSO Jaguar for ExxonMobil's Whiptail development.
FPSO P81 & FPSO P87 Comparison
Category | SEAP I (P81) | SEAP II (P87) |
Oil Capacity | 120,000 bopd | 120,000 bopd |
Gas Treatment | 355 MMscfd | 425 MMscfd |
Water Injection | 200,000 bpd | 120,000 bpd |
Water Depth | 2,500 m | 2,500 m |
Distance Offshore | 100 km | 80 km |
Fast4Ward Hull | 11th MPF Hull | 12th MPF Hull |
FID Date | April 2026 | December 2025 |
First Oil Target | 2031 | 2030 |
FPSO P81 Location
FPSO P-81 is part of Petrobras’ Sergipe Deepwater (SEAP) project in the offshore Sergipe-Alagoas Basin, in northeastern Brazil. The unit will be installed approximately 100 km from the coast, in ultra-deep water of around 2,500 metres.
SEAP I covers the Agulhinha, Agulhinha Oeste, Cavala and Palombeta fields, located in the BM-SEAL-10 and BM-SEAL-11 concession areas.
Project Background
As appraisal work confirmed sufficient reserves across the BM-SEAL-4, BM-SEAL-4A, and BM-SEAL-10 concessions to justify dedicated floating production infrastructure, Petrobras split the development into SEAP I and SEAP II, each requiring its own FPSO, but drawing on a shared concession area and reservoir system.
Petrobras has stated explicitly that the SEAP-I project only achieved sufficient financial returns for inclusion in the company's base implementation portfolio after the company revised contractual terms and conditions to enable a joint negotiation of both the P-81 and P-87 FPSO contracts together.
Once the joint-negotiation approach unlocked SEAP-I's economics, Petrobras moved quickly: FID for SEAP-I followed in April 2026, and by May 29, 2026, both the P-81 and P-87 contracts were signed with SBM Offshore on the same day.
Trusted by Leading Manufacturers & EPCs
Find The Latest FPSO Projects In Brazil
Gain exclusive access to our industry-leading database of FPSO project opportunities with detailed project timelines & stakeholder information
No credit card Up-to-date coverage
FPSO P81 Current Status
As of October 2026, FPSO P-81 is in the early construction phase of the Sergipe Águas Profundas I (SEAP-I) project. Petrobras awarded the contract to SBM Offshore in May 2026. According to SBM Offshore’s Half-Year 2026 project update, SEAP-I was under construction and less than 25% complete as of 30 June 2026. The FPSO is scheduled for delivery in 2031.
Stakeholder Details
Stakeholder Role | Individual/Organisation |
Operator/Owner | Petrobras |
Partner (BM-SEAL-4) | ONGC Campos Limitada — subsidiary of India's Oil and Natural Gas Corporation (ONGC); 25% stake in the BM-SEAL-4 concession alongside Petrobras' 75% |
FPSO Builder | SBM Offshore N.V. (Netherlands) |
Regulatory Authority | ANP (Agência Nacional do Petróleo, Gás Natural e Biocombustíveis) |
Environmental Authority | IBAMA |
SBM Offshore Precedent Projects | Same Fast4Ward® programme used for FPSO Jaguar (ExxonMobil Guyana Whiptail) and multiple Búzios units for Petrobras |
FPSO P81 Cost Details
The total estimated cost for FPSO P81 (SEAP I) is not disclosed officially. However, Petrobras confirmed the combined program investment of over 60 billion Brazilian reais (USD 12 billion) and the BOT contract with SBM Offshore for two FPSOs.
Project Timeline
Year | Event |
2031 | Expects First oil from P-81 (SEAP-I) |
2026-2030 | SBM Offshore designs and constructs P-81 at its Fast4Ward programme fabrication facilities |
29 May 2026 | Petrobras signs contracts with SBM Offshore for both SEAP FPSOs (P-81 and P-87) |
April 2026 | Petrobras approves FID for the SEAP I project specifically |
Design & Engineering Details
FPSO Type | New-build FPSO |
Oil Production Capacity | 120,000 barrels of oil per day (bopd) |
Gas Treatment Capacity | 355 million standard cubic feet per day (MMscfd) |
Water Injection Capacity | 200,000 barrels per day |
Water Depth | 2,500 meters |
Mooring | Spread Mooring |
Gas Export Infrastructure | Direct export pipeline to shore |
O&M Contract Term | Initial 6.5 years |
Conclusion
Located in ultra-deep water roughly 100 km off Sergipe’s coast, the FPSO P81 is intended to unlock large-scale production from the SEAP I fields, with capacity to produce 120,000 barrels of oil per day and process substantial volumes of associated gas. Its development also supports the creation of new offshore-to-onshore gas infrastructure for Brazil’s Northeast.
Read Next: Albacora P 88 FPSO: Latest Updates (2026)
Track the Latest & Upcoming FPSO Projects In Brazil
Subscribe to our upcoming and ongoing FPSO Projects in Brazil with ease to access reliable, high-quality insights on forthcoming and completed Projects across the country.
Our user-friendly platform provides essential details, timely updates, key stakeholder contact information, and business opportunities tailored for engineering companies, industry professionals, investors, and government agencies.
Start a free demo to take your business to the next level.
Leave a Comment
We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.
We read every comment and do our best to respond to them all.