Project at a Glance | |
Project Name | Agra Bareilly Expressway |
Alternate Name | Mathura–Bareilly Corridor |
Project Type | Greenfield |
Project Status | Under Construction |
Starting Point | Agra, Uttar Pradesh |
Ending Point | Bareilly, Uttar Pradesh |
Total Length | 228 km |
Developer | National Highway Authority of India (NHAI) |
Parent Programme | Bharatmala Pariyojna Phase I |
Total Project Cost | INR 7,700 crore |
Civil Packages | 4 Packages |
Key Structures | 20 flyovers; 26 underpasses; 6 railway overbridges (ROBs); 5 river bridges; 4 bypasses |
Travel Time Upon Completion | 2.5 hours |
Project Completion Date | December 2027 (Expected) |
Tourism Benefits | Enhances access to Nainital (via Bareilly), Mathura-Vrindavan, Agra (Taj Mahal), Kasganj, and pilgrimage sites along the Ganga corridor |
Project Overview
The Agra Bareilly Expressway, formally known as the Mathura-Bareilly Corridor, is a 228 km four-lane access-controlled greenfield highway. It is an under-construction project by NHAI, identified under the Bharatmala Pariyojna Phase I. It runs north to south through western and central Uttar Pradesh, linking Agra with Bareilly, the divisional headquarters of the Rohilkhand region.
The corridor traverses approximately 15 districts, with its key intermediate nodes being Mathura, Hathras, Kasganj, and Budaun. The project is being executed in four packages:
Agra to Hathras
Hathras to Kasganj
Kasganj to Budaun
Budaun to Bareilly
A strategically important feature of the project is the Binawar interchange in Budaun district, where the Agra–Bareilly Highway meets the Ganga Expressway and the Moradabad–Farrukhabad Highway at a single major junction.
This three-way convergence creates a node that dramatically expands the expressway's functional reach, enabling traffic from eastern UP (Ganga Expressway), the Moradabad-Rampur corridor, and the Agra-Mathura belt to interchange at a single well-connected point. For commuters, this means the Agra–Bareilly Expressway is not merely a bilateral corridor but a connector within a rapidly expanding UP expressway grid.
The infrastructure includes 20 flyovers, 26 underpasses, 5 major bridges, and 6 rail over-bridges to ensure seamless connectivity. Once operational, the Agra-Bareilly Expressway will reduce travel time between the two cities from approximately 5 hours to 2.5 hours.
NHAI Project Director Sanjay Verma has confirmed December 2027 as the project's completion target. The expressway will also serve as an improved tourism corridor connecting Mathura-Vrindavan, the Taj Mahal complex in Agra, and Nainital, making it one of the most tourism-rich highway corridors in northern India.
Technical Specifications
Lane Configuration | 4 lane |
Flyovers | 20 major flyovers |
Underpasses | 26 underpasses |
Railway Overbridge | 6 Railway Over Bridges (ROB’s) |
River Bridges | 5 bridges — most significant: (1) Yamuna bridge at Brahman Ghat, Mathura (complete); (2) Ganga bridge at Soron, Kasganj (planned) |
Bypasses | 4 bypasses — Binawar (Budaun), Malgaon (Budaun), Bhamora- Devchara (Bareilly, 5 km — longest), and one additional location |
Project Background
The Agra–Bareilly Expressway was identified as a priority project under Bharatmala Pariyojna Phase I, approved by the Union Cabinet in October 2017. Initially, the two cities were connected via congested state and national highways that passed through numerous towns and intersections, generating a journey of approximately five hours for 228 km.
NHAI selected a greenfield alignment to avoid the congestion of existing corridors, and the Detailed Project Report was prepared with SA Infrastructure Consultants and other NHAI technical partners.
One of the most significant early milestones was the completion of the bridge over the Yamuna at Brahman Ghat in Mathura — a critical crossing on the southern end of the corridor. The Ganga bridge at Soron (Kasganj district) is planned, but its completion timeline has not been separately confirmed.
Land acquisition of the greenfield expressway was completed across all four packages, with Rs 1,527 crore in compensation disbursed to landowners and NHAI confirming no pending land cases as of December 2025.
Trusted by Leading Manufacturers & EPCs
Find The Latest Road Infrastructure Projects In India
Gain exclusive access to our industry-leading database of Road Infrastructure Projects opportunities with detailed project timelines & stakeholder information
No credit card Up-to-date coverage
Agra Bareilly Expressway Current Status
The Agra Bareilly Expressway is an under-construction project, expected to be completed by December 2027. It will be developed in four phases. The first phase between Mathura and Devinagar is partially operational. The second phase from Hathras to Kasganj is approximately 60% done. Phase III is nearly 28% done, along with ongoing work on Phase IV from Budaun to Bareilly.
Stakeholders Details
Stakeholder Role | Individual/Organisation |
Project Developer | National Highway Authority of India (NHAI) |
Project Director (NHAI) | Sanjay Verma |
Package I Contractor | PNC Infratech Ltd |
Package II Contractor | GR Infra Private Limited |
Package III Contractor | Dhariwal Construction Private Limited |
Package IV Contractor | Dhariwal Construction Private Limited |
Environmental Regulatory | Ministry of Environment, Forest and Climate Change (MoEF&CC) |
Agra Bareilly Expressway Route
The Agra Bareilly Expressway connects Agra, home to the Taj Mahal and one of UP's most significant tourist and commercial cities, with Bareilly, the divisional headquarters of the Rohilkhand region and a major industrial and trade centre. It runs from North to South through western and central Uttar Pradesh.
The route starts from Badh village in Mathura near NH-19 and ends at Chaubari in Bareilly near NH-24 (Delhi-Lucknow highway). The corridor traverses approximately 15 districts, with its key intermediate nodes being Mathura, Ray, Hathras, Kasganj, and Budaun. It passes through an interchange connecting to the Yamuna Expressway at Ray.
Currently, it takes 5 hours to cover the 228 km distance. Upon the completion of the expressway, the travel time will be reduced to 2.5 hours, benefiting commuters across Uttar Pradesh.
Agra Bareilly Expressway Project Cost
Financial Item | Details |
Total Project Cost | INR 7,700 crore |
Land Acquisition Compensation | INR 1,527 crore |
Earlier Cost Estimate | INR 4,000 crore |
Funding Mode | Central Government funding via NHAI under Bharatmala Phase I |
Revenue Model | Toll collection under NHAI's national highway toll policy |
Project Timeline
Year | Event |
December 2027 | Expected completion of the project |
2024 | Land acquisition is officially completed across all packages. |
2022-2023 | Active construction underway across Packages 1 and 2. River Bridge over River Yamuna at Brahman Ghat (Mathura) has been completed. |
2021-22 | Contracts awarded for each phase |
2018-2020 | Detailed Project Report (DPR) prepared. |
October 2017 | Bharatmala Pariyojna Phase I was approved by the Union Cabinet. |
Trusted by Leading Manufacturers & EPCs
Find The Latest Road Infrastructure Projects In India
Gain exclusive access to our industry-leading database of Road Infrastructure Projects opportunities with detailed project timelines & stakeholder information
No credit card Up-to-date coverage
Agra Bareilly Expressway Project Contractors & Packages
Packages | Route | Length | Contractor |
Package I | Mathura to Hathras | 66 km | PNC Infratech Ltd |
Package II | Hathras to Kasganj | 57 km | GR Infraprojects Pvt Ltd |
Package III | Kasganj to Budaun | 46 km | Dhariwal Construction Pvt Ltd |
Package IV | Budaun to Bareilly | 59 km | Dhariwal Construction Pvt Ltd |
Benefits
The following are the benefits of the project:
Attracts Real Estate Investments: The expressway attracts investors' interest in logistics, cold storage, and residential development, benefiting districts like Hathras, Kasganj, and Budaun.
Improves Connectivity: Improves regional connectivity across western and central Uttar Pradesh, linking western districts with the Rohilkhand region. It also connects Mathura, Agra, Tundla, Etah, Kasganj, Hathras, Budaun, and Bareilly directly.
Reduce Travel Time: The expressway reduces travel time from 5-6 hours to 2.5 hours by establishing direct connectivity to Agra, Mathura, and Bareilly.
Relieves Congestion: The Agra-Bareilly Expressway relieves congestion through several key infrastructure features and design strategies, including Flyovers, Underpasses, & Railway Overbridges.
Employment Generation: The expressway creates logistics hubs for continuous employment in loading, transport coordination, inventory management, and security.
Attracts Tourism: Attracts religious and heritage tourism in regions like Mathura and Vrindavan due to easier access.
Reduces Vehicle Strain: Reduces vehicle strain and fatigue burnout, making long journeys practical and cost-effective.
Conclusion
The Agra Bareilly Expressway, a 228 km long project, is an under-construction project by NHAI. Connecting Agra to Bareilly in 2.5 hours, the expressway is expected to be completed by December 2027. It is a transformative infrastructure project, improving connectivity across Uttar Pradesh.
The project will benefit 15 districts across western and central Uttar Pradesh, including Agra, Mathura, Hathras, Kasganj, Budaun, and Bareilly, serving as a vital catalyst for economic development, tourism growth, and logistics expansion.
The project will not only save fuel and reduce vehicle strain but also create thousands of jobs during construction and afterward in logistics, tourism, and related sectors, while attracting industries to the region due to cheaper land and labour costs.
Track the Latest Infrastructure Projects in India for Business Opportunities.
Subscribe to our upcoming and ongoing Road Infrastructure Projects in India to access reliable, high-quality insights on forthcoming and completed infrastructure projects across the country.
Our user-friendly platform provides essential details, timely updates, key stakeholder contact information, and business opportunities tailored for engineering companies, industry professionals, investors, and government agencies.
Start a free demo to take your business to the next level.
Leave a Comment
We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.
We read every comment and do our best to respond to them all.