Project intelligence
- ✓ Scope, phases, and campus context
- ✓ IT load and total power (MW) per phase
- ✓ Investment value, total and per phase
- ✓ Timelines, milestones, and RFS dates
- ✓ Location with coordinates
Discovering and tracking projects and tenders is not easy. With Blackridge Research''s Global Project Tracking (GPT) platform, you can identify the right opportunities and grow your pipeline while saving precious time and money doing it.
PROJECTS
0+
INVESTMENT
$5.96T
REGIONS
24
New project alert
Hover any state or region for details.
Trusted by 500+ manufacturers, EPC contractors, consultants, investors & technology providers worldwide
Every record answers the questions a bid or no-bid meeting actually asks, and shows its sources.
FULL LIFECYCLE COVERAGE
Most tools see a project at announcement. Each stage is a different buying window, so every record is stage-tagged and alerts fire when a watched project moves.
Project stage
Rumors, government planning, utility inquiries, code-named filings
Engage now: Investors, land brokers, site-selection and power consultants
Project stage
Land acquisition, site selection, feasibility studies
Engage now: Real estate, feasibility and owner's-engineer advisors
Project stage
Zoning, environmental approval, power allocation, grid connection
Engage now: GCs pre-qualify; architects and engineers position for design
Project stage
Investment approval, financial close, sponsor commitments
Engage now: Lenders, insurers, project-finance advisors
Project stage
Designer appointed, basis-of-design set, specifications written
Engage now: Equipment vendors get specified in; long-lead orders start
Project stage
GC and EPC selection, package RFQs, procurement schedules
Engage now: Contractors bid; generator, UPS, switchgear, cooling vendors quote
Project stage
Packages awarded, subcontracting begins
Engage now: Sub-tier suppliers approach winners; competitors recalibrate
Project stage
Civil, shell, then MEP fit-out, with phased expansion in parallel
Engage now: Commissioning agents, O&M providers, retrofit and upgrade suppliers
WHO IT'S FOR
The same database, filtered to the stage and fields each team actually uses. Pick a seat at the table.
Pipeline Operators and Midstream Owners
Plan, build, and optimize pipeline networks using verified project data and real-time status updates.
Spot greenfield and brownfield pipeline opportunities by region, commodity, diameter, and status to guide capital allocation.
Benchmark route options and competing corridors using route maps and GIS-ready coordinates to reduce route conflicts.
Track permit milestones such as FERC filings, PHMSA approvals, and environmental clearances to predict schedule risk earlier.
Validate cost assumptions with capex ranges by length, terrain, and crossings to improve FID readiness.
Identify potential JV partners and gathering tie-ins from operator and facility linkage data to accelerate throughput.
Monitor competitor activity including EPC awards and material orders to adjust your development queue.
Plan compression strategy using station counts, horsepower ranges, and elevation profiles to right-size equipment.
Prioritize community outreach using county-level route passes and land parcel density to reduce objections.
Sync your internal portfolio with project IDs and status updates to keep PMO reports accurate and current.
EPC Contractors and Pipeline Builders
Grow backlog and deliver profitable projects by targeting the right bids at the right time.
Build a qualified bid funnel by filtering projects at FEED, tendering, or pre-EPC award stages to time pursuit.
Identify decision makers with verified owner, PMC, and procurement contacts to speed pre-bid engagement.
Estimate crews and spreads using segment lengths, terrain class, and crossing counts to plan resource loading.
Win work by targeting packages like mainline, stations, and terminals using detailed scope breakdowns.
Reduce bid risk with insights on welding spec, coating type, and hydrotest plans to price consumables accurately.
Optimize equipment mobilization using scheduled start dates and staging locations to minimize standby.
Track competitor incumbency and past awards to shape teaming strategies and pricing.
Pipe Mills, Coating Plants, and Fittings Suppliers
Match manufacturing capacity to near-term pipeline demand and secure early commitments.
Forecast mill runs by filtering pipelines by diameter, wall thickness, and API grade to plan production slots.
Match coating lines to demand by identifying FBE, 3LPE, or 3LPP specifications per project to set resin procurement.
Target MRO versus new build orders by separating replacement segments from greenfield lines to refine sales outreach.
Reduce freight cost by mapping route proximity to mills and coating yards to propose bundled delivery.
Prepare QA documentation packs aligned to project specs and country of origin requirements to speed approvals.
Engage early with EPC estimators using planned tonnage and delivery windows to secure mill commitments.
Offer complete packages by spotting fittings, bends, induction bends, and flanges required along with mainline pipe.
Protect margin by tracking price sensitivity and alternative material approvals noted in FEED documents.
Valve, Pump, and Compressor OEMs
Align inventory and production with upcoming station and block valve packages.
Target station packages by filtering projects with planned pump or compressor stations and required horsepower ranges.
Align inventory with demand using valve size, pressure class, and actuator type specified for each segment.
Shorten technical cycles by downloading spec sheets and standards referenced to pre-fill datasheets.
Coordinate with integrators by seeing which EPC or station contractor holds the package to contact at the right time.
Reduce lead time risk by planning casting and machining capacity against forecasted award dates.
Win aftermarket work by tracking commissioning dates to schedule spares and service campaigns.
Engineering and FEED Consultants
Find and scope design work with accurate inputs for routes, stations, and crossings.
Identify upcoming FEED opportunities by spotting projects moving from concept to pre-FEED status within your regions.
Build stronger proposals with route length, crossings, and environmental constraints to scope hours accurately.
Accelerate design using benchmark data on similar diameter and terrain projects to set early design envelopes.
Improve cost estimates with historical capex per inch-mile and station cost models from comparable projects.
Reduce reroutes by checking land use layers and protected areas tied to each project to avoid conflicts early.
Plan surveys by viewing required HDDs, river crossings, and rail intersections to allocate specialist teams.
Coordinate multi-discipline work by seeing station counts, metering sites, and tie-in points to sequence deliverables.
Support permitting with a list of agencies, filed applications, and expected review durations to build the schedule.
Increase win rates by contacting owners and PMCs before RFP release using verified stakeholder contacts.
Showcase expertise by tracking lessons learned and change drivers on similar completed lines to de-risk proposals.
Surveying, GIS, and Route Selection Firms
Secure survey scopes and deliver faster using route data and GIS exports.
Generate work quickly by identifying projects with incomplete route definition that need surveys and centerline selection.
Export route alignments and KMZ coordinates where available to accelerate desktop studies and field planning.
Prioritize segments with complex topography and water crossings to propose LiDAR and bathymetric services.
Reduce revisit costs by aligning survey windows with planned construction spreads and access road schedules.
Improve deliverables by matching owner GIS schema and datum preferences listed for each project.
Environmental and Permitting Consultants
Win permitting scopes and lower approval timelines with targeted insights.
Target projects at scoping and EIA stages using status filters to offer baseline studies and impact assessments.
Plan field teams by reviewing habitat types, sensitive species flags, and wetland ratios along the proposed route.
Speed approvals by mapping required federal, state, and local permits per project with typical timelines.
Reduce legal risk by tracking consultation requirements with indigenous and community stakeholders named in the record.
Offer mitigation plans tailored to crossing methods like HDD or microtunnel where frac-out risk is higher.
Coordinate with design by flagging reroute hotspots from protected areas and cultural sites to the owner early.
Win change orders by monitoring permit conditions that add surveys, monitoring, or reclamation work.
Demonstrate compliance by aligning reports to referenced standards and agency guidance listed in the database.
Right-of-Way and Land Services Companies
Focus agents on the right counties and close easements on time.
Identify corridors entering acquisition phase to pitch title research, appraisal, and negotiation services.
Prioritize outreach using county and parcel density data along the alignment to staff agents efficiently.
Reduce objections by aligning communication plans to community and landowner stakeholders listed for the project.
Improve schedules by planning access agreements and temporary workspace needs based on spread plans.
Increase close rates by tracking eminent domain risk and alternative route options that affect negotiations.
Coordinate with construction by syncing easement status to planned mobilization dates to avoid delays.
Inspection, Integrity, and NDT Providers
Fill crews and equipment calendars with upcoming inspection and testing work.
Find opportunities in hydrotest, weld inspection, and coating holiday detection by filtering by construction phase.
Target in-line inspection work by tracking piggable segments, launcher locations, and minimum bend radius.
Staff certified crews based on welding processes, material grades, and sour service flags specified per project.
Reduce rework by aligning test plans with owner specs and API standards referenced in the project record.
Plan equipment logistics using spread locations, yard sites, and expected weld counts per day.
Expand into operations by following commissioning dates to propose baseline ILI and corrosion monitoring.
Improve bids with historical defect rates and repair factors from comparable projects in similar soil conditions.
HDD, Trenching, and Specialty Construction Subcontractors
Find complex crossings and specialty scopes that match your niche equipment.
Fill backlog by finding projects with HDD, microtunnel, or rock trenching requirements and crossing lengths.
Bid accurately by using geotechnical notes, crossing types, and entry exit constraints captured per crossing.
Schedule spreads by aligning mobilization with mainline contractor timelines and permit windows for water crossings.
Reduce risk by reviewing frac-out sensitivities and fluid management requirements noted by environmental teams.
Win more work by contacting the awarded EPC and station contractors listed to secure subcontract packages.
CONTACTS
Verified contacts attached to real projects: the development director at the owner, the procurement lead at the GC, the engineering lead at the consultant. Each one is confirmed by a researcher, then re-verified as the project advances.
Director of Procurement
Meridian Build Group
Singapore
VP, Development
Northgate DC Partners
Dallas, TX
Head of Engineering
Nordvik Colo
Stockholm, SE
Project Finance Lead
Granton Infrastructure
London, UK
Sample profiles. Real names and outreach details unlock with a subscription, and the relevant contact changes by stage, so records are re-verified as a project advances.
No manual data entry, no missed opportunities. Flexible licensing for internal tools, customer products, analytics platforms, or enterprise applications.
Push discovered projects, stakeholder contacts, and deal opportunities directly into HubSpot the moment they surface.
Map global projects to Salesforce opportunities in real time. Enrich records with procurement timelines, budgets, and verified contacts.
Automatically create leads, accounts, and contacts in Zoho enriched with project stage, budget, and procurement intelligence.
Don't see your tool? Request an integration →
One package covers all endpoints — projects, contacts, tenders, and stakeholders.
Pass your API key at initialization. Supports environment variables out of the box.
Filter by sector, stage, country, value range and more than 40 fields.
Every response already contains stakeholders, contacts and tender data.
Recent Intelligence
The Dunkerque Offshore Wind Farm has a power generation capacity of 600 MW. Click to know about the project’s location, cost, & contractor details.
WHY TIMING DECIDES
Western Europe Pipeline (Oil & Gas) Projects Database owners are among the most secretive buyers in Pipeline (Oil & Gas). By the time a project is public, most of its budget is already committed.
Hyperscalers buy land through shell companies and file permits under code names. A campus can be well over a year into development before its end user is confirmed. If your pipeline runs on press releases, you are last to know.
GCs are appointed before ground-breaking, and long-lead equipment is ordered 12 to 24 months before delivery. By the time steel is visible from the highway, most of the contract value is already committed.
The rest lives in planning filings, permits, grid queues, and tender portals across dozens of languages. English keyword alerts were never going to find a permit filed in Bahasa Malaysia.
long-lead window for transformers and large generators, so early visibility decides whether you quote or decline
of contract value typically committed before construction is visible from the road
countries of permit, grid, and tender portals in dozens of languages, between you and a complete pipeline
per week a BD manager spends scanning news, LinkedIn, and portals, per market
WHAT'S INSIDE
Every field is sourced from primary filings in the local language and verified before it reaches your dashboard.
Analysts read municipal filings, environmental approvals, and tender portals in the local language, with every record citing its source document.
Gross and IT MW captured per phase so a campus in Malaysia compares directly with one in Ireland.
Announced capital expenditure converted to USD, with the local-currency figure and conversion date retained.
Named owner, developer, and EPC contacts in every market, re-verified on a rolling 90 day cycle.
Open tenders, shortlists, and awarded packages linked to the project they belong to.
Push new and updated projects straight into your CRM so the pipeline reaches the team that works it.
HONEST COMPARISON
Discovery is now a solved, subscribable problem. Deal selection and relationships are not.
| Capability | Manual research | News alerts | Contact databases | Generic construction DBs | This database |
|---|---|---|---|---|---|
| Pre-announcement discovery | Possible, costly | No | No | Rare | Permits, filings, primary research |
| Pipeline Oil And Gas fields (MW, type, stage) | Build it yourself | No | No | Partial | Native |
| Verified decision-maker contacts | Slow | No | Titles only, unverified | Generic | Researcher-verified, by stage |
| Tender and award tracking | Sporadic | Keyword luck | No | Partial | Systematic, every tracked market |
| Change alerts on specific projects | No | Keyword noise | No | Limited | Project and field level |
| Local-language coverage | Rare | Poor | Poor | Varies | Regional analysts, native language |
| Structured export, API, CRM | Manual | No | Limited | Some | Excel, REST API, Salesforce, HubSpot |
| Institutional memory | Leaves with the employee | None | None | Partial | Permanent, shared, auditable |
| Annual cost | Loaded cost of a researcher | Free plus hidden hours | Per seat | Mid | A fraction of one hire |
| Manual research | Possible, costly |
|---|---|
| News alerts | No |
| Contact databases | No |
| Generic construction DBs | Rare |
| This database | Permits, filings, primary research |
| Manual research | Build it yourself |
|---|---|
| News alerts | No |
| Contact databases | No |
| Generic construction DBs | Partial |
| This database | Native |
| Manual research | Slow |
|---|---|
| News alerts | No |
| Contact databases | Titles only, unverified |
| Generic construction DBs | Generic |
| This database | Researcher-verified, by stage |
| Manual research | Sporadic |
|---|---|
| News alerts | Keyword luck |
| Contact databases | No |
| Generic construction DBs | Partial |
| This database | Systematic, every tracked market |
| Manual research | No |
|---|---|
| News alerts | Keyword noise |
| Contact databases | No |
| Generic construction DBs | Limited |
| This database | Project and field level |
| Manual research | Rare |
|---|---|
| News alerts | Poor |
| Contact databases | Poor |
| Generic construction DBs | Varies |
| This database | Regional analysts, native language |
| Manual research | Manual |
|---|---|
| News alerts | No |
| Contact databases | Limited |
| Generic construction DBs | Some |
| This database | Excel, REST API, Salesforce, HubSpot |
| Manual research | Leaves with the employee |
|---|---|
| News alerts | None |
| Contact databases | None |
| Generic construction DBs | Partial |
| This database | Permanent, shared, auditable |
| Manual research | Loaded cost of a researcher |
|---|---|
| News alerts | Free plus hidden hours |
| Contact databases | Per seat |
| Generic construction DBs | Mid |
| This database | A fraction of one hire |
Trust in a database comes from methodology, not marketing. This is how a record is built, and why you can stake a bid on it.
Analysts assigned by region and languages continuously monitor every source layer. A permit filed in Bahasa Malaysia or a tender in Brazilian Portuguese is not caught by English keyword scraping; it is caught by the person whose job is that market. Automated monitoring flags candidate signals, and researchers qualify them.
Every material fact (capacity, investment, dates, stakeholders) must reconcile across at least two independent sources, with primary documents outranking press coverage. Conflicts are flagged rather than averaged, and estimates are labeled as estimates.
For significant projects and all contact data, researchers confirm directly with project stakeholders. This is where code-named projects get connected to their real owners, the step no automated pipeline performs.
Re-check cycles are tiered by stage, with active projects checked most often. Every record carries its sources and a last-verified timestamp, and watched projects trigger alerts on any change.
Find more opportunities across different regions in this sector and explore other industries we cover in this region.
FAQ
The Global Project Tracker is a comprehensive database about construction projects around the world covering all phases of development.\n\nWe find and track projects from the inception stage to completion encompassing all the major industry sectors.\n\nEach project profile includes details, such as the project description, status, scope, size, value, funding mode, location, major event dates, and milestones, as well as contact details of the project owner, contractors, and stakeholders.
The database is updated daily, with new projects and tenders being added and updated in a timely manner. \n\nTo make sure you have the most recent information, you should check the database often and sign up for alerts that will let you know about new projects and tenders that match your criteria.
No, the database includes both new construction projects (greenfield projects) and expansions, renovations, and upgrades to existing structures (brownfield projects).
Yes, the database allows users to search for projects by location, so you can easily find projects and tenders in your area of interest.
No, the database is for anyone interested in the construction industry. This includes manufacturers and suppliers, EPC companies/Developers/Contractors, banks and insurance companies, asset management, operation and maintenance (O&M) companies, logistics and warehousing firms, consulting companies, law firms, and investors, among others.
If you are interested in subscribing to the Global Project Tracker, please contact our sales team via email or our contact form.\n\nIf you tell us more about your requirements and goals, our team will make a proposal that fits your needs. Once you accept our proposal and complete the payment, we will send you login credentials to access the platform.\n\nA customer success specialist will also be available to show you how to use the platform, and a research analyst will be assigned to help you with any questions or problems that may come up during the active subscription period.
You will need to send an email to [email protected] to submit a tender in our database. \n\nOur team will share the submission guidelines to ensure your tender is live in our database.
The cost of Global Project Tracker subscription varies based on factors like the number of users, regions, sectors, project development stages, and additional features or services included in the package.\n\nContact our sales team for personalized pricing options and to choose the ideal package for your requirements.
Yes, it is possible to add more users to your subscription anytime. \n\nFor each extra user you add to your subscription, you will usually have to pay a per-user fee.