Fujairah Desalination Plant

project_profile

Fujairah Desalination Plant

Updated on Jun 04, 2026, 06:57 PM IST
Written & Edited by Ashish

 

 

 

 

 

 

 

 

Project at a Glance 

 

 

 

 

 

 

 

 

 

 

Project Name 

 

 

 

Fujairah Water and Electricity Desalination Plant

 

 

 

 

 

 

 

 

 

Project Type

 

 

 

Greenfield

 

 

 

 

 

 

 

 

 

Project Location 

 

 

 

Abu Dhabi

 

 

 

 

 

 

 

 

 

Sector

 

 

 

Utilities

 

 

 

 

 

 

 

 

 

Subsector

 

 

 

Water Infrastructure

 

 

 

 

 

 

 

 

 

Project Value 

 

 

 

 

 

 

 

 

 

 

Fujairah 1 desalination plant

 

 

 

USD 650 - 700 Million (estimated)

 

 

 

 

 

 

 

 

 

Fujairah 2 desalination plant

 

 

 

USD 2.17 Billion

 

 

 

 

 

 

 

 

 

Project Status

 

 

 

Completed/Commissioned

 

 

 

 

 

 

 

 

 

Desalinated Water 

 

 

 

263 MIGD

 

 

 

 

 

 

 

 

 

Power Generation

 

 

 

2.96 GW

 

 

 

 

 

 

 

 

 

Built by

 

 

 

 

 

 

 

 

 

 

Fujairah 1 desalination plant

 

 

 

TAQA and Sembcorp

 

 

 

 

 

 

 

 

 

Fujairah 2 desalination plant

 

 

 

TAQA, ENGIE and Marubeni

 

 

 

 

 

 

 

 

 

Operated and Managed by

 

 

 

 

 

 

 

 

 

 

Fujairah 1 desalination plant

 

 

 

TAQA and Sembcorp

 

 

 

 

 

 

 

 

 

Fujairah 2 desalination plant

 

 

 

FAPCO

 

 

 

 

 

 

 

 

 

Project Start & Commissioned Date

 

 

 

 

 

 

 

 

 

 

Fujairah 1 desalination plant 

 

 

 

2002-2004

 

 

 

 

 

 

 

 

 

Fujairah 2 desalination plant

 

 

 

2007-2011

 

 

 

 

 

 

 

 

Trusted by Leading EPCs & Manufacturers

Find Desalination Plant Projects and Tenders in the UAE

Gain exclusive access to our industry-leading database of desalination opportunities with detailed project timelines and stakeholder information.

Request Free Trial → Learn More →

No credit card Up-to-date coverage

 

Project Overview

The Fujairah desalination plant located in Abu Dhabi has two desalination plants called the Fujairah 1 desalination plant and the Fujairah 2 desalination plant. It is considered one of the top 5 desalination plants in the UAE. Together, these two desalination plants produce 263 MIGD (Million Imperial Gallons of water per day). Being a dual-facility the Fujairah F1 & Fujairah F2 desalination plants generate 2.96 GW (Gigawatts) power alongside the desalination process.  

 

Fujairah F1 desalination plant

 

Built in different timelines both the Fujairah desalination plants are unique and different with advanced and innovative desalination technology applied. Both the Fujairah desalination plants contribute significantly to the UAE’s water supply needs.

 

With increased demand and supply needs the Fujairah plant sees a development of Fujairah F3 is being built as the largest independent thermal power plant in the UAE. It will serve as a stable source of power supply crucial for the development of the emirate of Fujairah. 

 

Project Background

The Fujairah port desalination plant was driven by various factors such as water scarcity. The UAE (United Arab Emirates) is a dry land with a climate with low rainfall and limited water resources. Thus, leading to the Fujairah desalination plant. 

 

Fujairah desalination plant

 

The Fujairah F1 desalination plant & Fujairah F2 desalination plants aim to serve the water and electricity needs in the Northern Emirates of Fujairah known for its immense population and economic development. 

 

The Fujairah F1 desalination plant built in 2002 was the first hybrid desalination plant in the Middle East combining power and desalinated water generation. Commissioned in 2004, it is a combined-cycle natural gas-fired power plant. It functions on the MSF (Multi-stage flash) and RO. 

 

The Fujairah F2 desalination plant is designed to produce 136,500 cubic meters of potable water per day. This plant uses multi-effect distillation desalination technology. Additionally, its heat recovery steam generators help to improve overall energy efficiency.

 

Trusted by Leading EPCs & Manufacturers

Find Desalination Plant Projects and Tenders in the UAE

Gain exclusive access to our industry-leading database of desalination opportunities with detailed project timelines and stakeholder information.

Request Free Trial → Learn More →

No credit card Up-to-date coverage

 

Project Timeline

Fujairah desalination plant development timeline

 

Project Cost

The Fujairah F1 desalination plant (IWPP) began its construction in 2002 and was built in multiple phases with major investors such as TAQA and Sembcorp industries. The overall project cost is estimated to be around USD 650-700 Million. 

 

Fujairah desalination plant

 

Similarly, the Fujairah F2 desalination plant began its construction in 2007 and was built in multiple phases with major investors such as TAQA, ENGINE, and Marubeni. The overall project cost is USD 2.17 Billion. 

 

Project Scope

The Fujairah desalination plant is a SWRO (Seawater Reverse Osmosis) plant and includes the Fujairah F1 (IWPP) and Fujairah F2 (IWPP) desalination plants built as a dual facility to produce electricity and desalinated water. The Fujairah F1 & Fujairah F2 IWPP were commissioned in 2004 and 2011. Both these desalination plants produce 263 MIGD of fresh water sufficient to meet the drinking water production needs of millions of people.

 

Fujairah F2 desalination plant

 

Currently, the Fujairah seawater desalination plant produces 2.96 Gigawatts of power with the addition of Fujairah F3, 2.4 Gigawatts of additional power will be generated sufficient to provide electricity for 380,000 households.

 

The desalination technology used in Fujairah f1 iwpp (Independent Water and Power Plant) and Fujairah f2 iwpp desalination plants is MSF, RO, and MED (Multi-Effect Distillation) respectively. 

 

Trusted by Leading EPCs & Manufacturers

Find Desalination Plant Projects and Tenders in the UAE

Gain exclusive access to our industry-leading database of desalination opportunities with detailed project timelines and stakeholder information.

Request Free Trial → Learn More →

No credit card Up-to-date coverage

 

Project Partners 

Contractors

The major contractors in the Fujairah F1 desalination plant are TAQA (Abu Dhabi National Energy Company) and Sembcorp. 

 

The Fujairah F2 desalination plant is TAQA while the subcontractors are ENGIE and Marubeni. The Danway EME was one of the leading electrical & Instrumentation contractors for the Fujairah F2 desalination plant. The Fujairah F2 IWPP is operated by FAPCO (Fujairah Asia Power Company) an electricity company.

 

Suppliers 

 

 

 

 

 

 

 

 

 

Plant

 

 

 

Supplier

 

 

 

Contribution

 

 

 

 

 

 

 

 

 

 

 

Fujairah F1

 

 

 

Doosan

 

 

 

5 MSF Desalination Units of 12.5 MIGD

 

 

 

 

 

 

 

 

 

 

Degremont

 

 

 

RO Desalination Technology

 

 

 

 

 

 

 

 

 

 

 

 

 

Fujairah F2

 

 

 

Danway EME

 

 

 

Electrical & Instrumental works associated with gas turbines

 

 

 

 

 

 

 

 

 

 

SIDEM

 

 

 

Multi-effect Distillation

 

 

 

 

 

 

 

 

 

 

 

 

Investors

 

 

 

 

 

 

 

 

 

Desalination Plant

 

 

 

Investor

 

 

 

Ownership (%)

 

 

 

 

 

 

 

 

 

 

 

Fujairah F1

 

 

 

TAQA

 

 

 

60

 

 

 

 

 

 

 

 

 

 

Sembcorp

 

 

 

40

 

 

 

 

 

 

 

 

 

 

 

 

 

Fujairah F2

 

 

 

TAQA

 

 

 

60

 

 

 

 

 

 

 

 

 

 

ENGIE

 

 

 

20

 

 

 

 

 

 

 

 

 

 

 

 

Marubeni

 

 

 

20

 

 

 

 

 

 

 

 

 

 

 

 

Future Expansion

The Fujairah F3 power plant is a CCGT (Combined-Cycle Gas Turbine) plant with a desalination capacity to produce 2.4 gigawatts of electricity. It is the largest independent thermal power plant in the UAE. The power generated in the Fujairah F3 power plant is expected to be sufficient for up to 380,000 households.

 

 Fujairah desalination plant

 

Its advanced JAC-class turbine technology ensures efficient use of combined cycle technology. TAQA and Mubadala in a consortium own 60% of the Fujairah F3 power plant whereas Marubeni Corporation holds 40% of the plant. The power purchase agreement & shareholder agreement for the Fujairah F3 power plant were signed by EWEC, TAQA, and Marubeni Corporation in February 2020.

 

Conclusion

The Fujairah desalination plant in the UAE is one of the largest sea water desalination plants in the UAE. Other notable desalination plants in the Middle East include the Umm Al Quwain Desalination Plant and Ras AL Khaimah desalination plant. The Fujairah F1 (IWPP) and Fujairah F2 desalination plants secure vital water resources in the UAE. 

 

The Fujairah F1 (IWPP) uses the hybrid technology of power generation and desalination. Likewise, the Fujairah F2 has a larger capacity to generate power and desalinated water sufficient to fulfill the water and electricity needs of millions of people. Additionally, its steam generators ensure reduced energy consumption. The desalination technology used in Fujairah F1 (IWPP) is an RO plant along with MSF. Similarly, the Fujairah F2 uses the MED desalination technology.

 

Currently, the Fujairah F1 (IWPP) and Fujairah F2 together are producing 263 MIGD of water and 2.96 Gigawatts of power. The Fujairah F3 power plant is built to generate 2.4 Gigawatts of power sufficient for 380,000 households. Thus, the Fujairah desalination plants ensure water security and consistent power supply in the Middle East for millions of people. By utilizing advanced desalination technologies such as reverse osmosis, these facilities efficiently convert seawater into potable water thus, securing the water and power needs through Fujairah 1 IWPP and Fujairah 2 IWPP. 

 



 

Connect with decision-makers of the latest desalination plant projects in UAE for business opportunities.

Subscribe to Blackridge's Desalination Plant Projects and Tenders in UAE database to get access to reliable and high-quality insights on upcoming, in-progress, and completed desalination plant projects across the world or in your desired geographical location.

 

Our user-friendly platform provides essential details, timely updates, key stakeholder contact information, and business opportunities tailored for engineering companies, industry professionals, investors, and government agencies.


Start a free demo to take your business to the next level!

Tags

Leave a Comment

We love hearing from our readers and value your feedback. If you have any questions or comments about our content, feel free to leave a comment below.

We read every comment and do our best to respond to them all.

Protected by Cloudflare Turnstile