Project intelligence
- ✓ Scope, phases, and site context
- ✓ Capacity and output per phase (MW, tpa, units, sq ft)
- ✓ Investment value, total and per phase
- ✓ Timelines, milestones, and commissioning dates
- ✓ Location with coordinates
Discovering and tracking projects and tenders is not easy. With Blackridge Research''s Global Project Tracking (GPT) platform, you can identify the right opportunities and grow your pipeline while saving precious time and money doing it.
PROJECTS
2,500+
INVESTMENT
$2.80T
REGIONS
45
New project alert
New project added
Trusted by 500+ manufacturers, EPC contractors, consultants, investors & technology providers worldwide
None of the sample rows are at this stage.
The full database holds this data, including contacts and projects.
News and Insights
ScottishPower Renewables' MachairWind project reaches a milestone as its first statutory consultation ends, aiming to deliver 2GW of clean energy to Scotland.
Root-Power's 34MW Dounreay BESS project begins construction, supporting Scotland's energy transition. Read more.
test
Petrobras plans a new contracting approach for the Barracuda-Caratinga FPSO to revive output at Brazil’s Campos Basin, focusing on innovation, efficiency, and local engagement.
Renewable energy leader Axis Energy secures approval for 400 MW hybrid power project in Andhra, India, promoting clean power and sustainability, learn more
Every record answers the questions a bid or no-bid meeting actually asks, and shows its sources.
FULL LIFECYCLE COVERAGE
Most tools see a project at announcement. Each stage is a different buying window, so every record is stage-tagged and alerts fire when a watched project moves.
Project stage
Rumors, government planning, utility inquiries, code-named filings
Engage now: Investors, land brokers, site-selection and power consultants
Project stage
Land acquisition, site selection, feasibility studies
Engage now: Real estate, feasibility and owner's-engineer advisors
Project stage
Zoning, environmental approval, power allocation, grid connection
Engage now: GCs pre-qualify; architects and engineers position for design
Project stage
Investment approval, financial close, sponsor commitments
Engage now: Lenders, insurers, project-finance advisors
Project stage
Designer appointed, basis-of-design set, specifications written
Engage now: Equipment vendors get specified in; long-lead orders start
Project stage
GC and EPC selection, package RFQs, procurement schedules
Engage now: Contractors bid; generator, UPS, switchgear, cooling vendors quote
Project stage
Packages awarded, subcontracting begins
Engage now: Sub-tier suppliers approach winners; competitors recalibrate
Project stage
Civil, shell, then MEP fit-out, with phased expansion in parallel
Engage now: Commissioning agents, O&M providers, retrofit and upgrade suppliers
WHO IT'S FOR
The same database, filtered to the stage and fields each team actually uses. Pick a seat at the table.
Playground Equipment Manufacturers
Use the database to spot upcoming playground builds, match specs, and win more bids.
Identify municipalities and schools planning new playgrounds within the next 6 to 24 months to prioritize sales outreach.
Filter projects by age group, capacity, and theme to align catalog products with specific design needs.
Download spec sheets and plan sets to confirm fall zones, safety clearances, and installation requirements before quoting.
See budget ranges and funding sources to package compliant systems at the right price points.
Get direct contact details for project managers and landscape architects to book product demos and lunch and learns.
Track RFP release dates and pre-bid meetings to prepare submittals on time with complete documentation.
Flag projects with inclusive play or custom theming to offer specialized components and design support.
Monitor competitor brand mentions in specifications to plan equal or approved substitution strategies.
Export targeted bid calendars to coordinate dealer pipelines and installer availability by region.
Playground Surfacing Suppliers
Find projects needing poured-in-place rubber, tiles, turf, or engineered wood fiber and quote accurately.
Filter projects by surfacing type, fall height, and ASTM standard to deliver compliant system proposals.
Identify resurfacing and replacement cycles to build a steady maintenance and warranty pipeline.
Access square footage takeoffs and layout drawings to speed estimates and reduce measuring errors.
View climate zone and drainage notes to recommend base prep, binder, and edge details that last.
Contact procurement officers to confirm alternates, warranties, and testing requirements before bidding.
Track punch list dates and warranty milestones to schedule inspections and service visits proactively.
Landscape Architecture Firms
Use the database to find design RFQs, align with community goals, and build winning proposals.
Find upcoming planning and design RFQs for park and playground projects in your target counties and school districts.
Review community demographics and walk-time data to shape inclusive and age-balanced programming.
Access existing site photos, utilities, and GIS layers to scope surveys, geotech, and subconsultant needs accurately.
Identify grant-funded projects that require concept renderings and engagement to structure your scope and fees.
Connect with parks staff and school boards to get on approved consultant lists ahead of shortlist decisions.
Benchmark budgets and cost per square foot to defend estimates during interviews and value engineering.
Study agency equipment and surfacing preferences to standardize details and reduce review cycles.
Track construction timelines to align design milestones with procurement and bid windows.
General Contractors and Installers
Fill your schedule with shovel-ready park and playground builds and reduce bid risk.
Sort for projects with issued for construction documents to keep crews booked during key seasons.
Download plan sets and equipment layouts to create accurate takeoffs and staging plans.
See soil notes, site access, and haul routes to plan mobilization and minimize change orders.
Contact owner reps to schedule site walks, verify utility locates, and confirm pre-bid requirements.
Compare bid bond, performance bond, and insurance limits to pursue only qualified opportunities.
Track addenda and official Q&A in one place to avoid scope gaps in your bid.
Sync awarded status to schedule crews, order long lead items, and lock in subcontractors.
Park and Recreation Departments
Plan capital improvements, benchmark peers, and speed procurement using current market data.
Benchmark peer agency budgets and lifecycle costs to build stronger capital improvement proposals.
Identify grant matches and deadlines tied to safety, accessibility, and health outcomes to stretch local funds.
Use asset age and condition data to prioritize replacements across your park system with clear criteria.
Review product recall and safety incident notes to target high-risk equipment for immediate action.
Compare surfacing performance and maintenance costs to select durable systems for your climate.
Find cooperative contracts and piggybackable bids to shorten your procurement timeline.
Discover inclusive play and sensory equipment examples to update standards and detail libraries.
Map nearby projects to coordinate joint-use opportunities with schools and HOAs.
Track warranty expirations and installer contacts to streamline warranty claims and repairs.
Share project pages with boards and community groups to align scope, schedule, and budget.
Grant Writers and Fundraising Consultants
Build compelling applications with hard data and proven funder targets.
Pull local park access gaps, ADA deficiencies, and equity indicators to strengthen need statements.
Capture usage counts, demographic profiles, and safety data to support measurable outcomes.
List funders and past awards for similar playgrounds to focus outreach on high-likelihood sources.
Align project schedules with grant cycles to avoid missed submission windows and cash flow gaps.
Generate itemized cost breakdowns and match tables that follow funder templates and caps.
Export community benefit metrics and stakeholder contact lists to assemble letters of support quickly.
Accessibility and Safety Consultants
Target projects that need ADA, ASTM, and CSA compliance audits and close gaps faster.
Filter sites by surfacing type, transfer platform counts, and route slopes to plan audits efficiently.
Access equipment model numbers and cut sheets to verify required standards against installed products.
Review clear space, reach range, and ramp dimensions to flag noncompliant details before inspections.
Track inspection dates, incident reports, and corrective action logs to schedule follow-up visits.
Share prioritized punch lists with owners and contractors to close safety gaps before opening day.
Shade, Lighting, and Site Furnishings Vendors
Spot gaps in concepts and offer add alternates that increase comfort and safety.
Identify projects that show limited shade or seating in concept plans to propose shelters and benches.
Use sun path and orientation notes to recommend canopy sizes and placement that reduce UV exposure.
Check electrical availability and pole specifications to quote compliant lighting and controls packages.
Contact designers early to get your models listed in the furnishings schedule and basis of design.
Track vandalism and theft notes to propose tamper-resistant hardware and finishes.
View delivery constraints and staging areas to plan shipments, crane picks, and installations.
Offer preventive maintenance plans tied to warranty terms to secure recurring service revenue.
Environmental and Stormwater Engineers
Win subconsulting scopes tied to drainage, erosion control, and water quality.
Filter projects by new impervious area and basin requirements to target the right stormwater scope.
Access soil reports, floodplain maps, and outfall data to size detention and infiltration systems correctly.
Coordinate splash pad recirculation and discharge permits with design teams before 50 percent CDs.
Review tree inventory and mitigation notes to plan preservation, planting, and soil volume strategies.
Track permitting agencies, reviewers, and timelines to keep submittals and approvals on schedule.
Smart Park Technology Providers
Bundle sensors, WiFi, counters, and cameras into power and lighting upgrades.
Find parks planning lighting or utility upgrades to bundle smart devices without extra trenching.
Use foot traffic estimates and event calendars to recommend accurate quantities and sensor types.
Access pole maps, conduit routes, and panel capacity to plan device locations and power needs.
Contact IT and facilities leads to align on networks, data ownership, and cybersecurity standards.
Propose panic buttons and camera coverage using incident heat maps to improve safety outcomes.
Integrate asset tags with the equipment list to enable live inventories and maintenance alerts.
Schedule pilot installs before grand openings to showcase analytics during ribbon cuttings.
Track maintenance SLAs and uptime targets to design service contracts that meet agency KPIs.
CONTACTS
Verified contacts attached to real projects: the development director at the owner, the procurement lead at the GC, the engineering lead at the consultant. Each one is confirmed by a researcher, then re-verified as the project advances.
Director of Procurement
Meridian Build Group
Singapore
VP, Development
Northgate DC Partners
Dallas, TX
Head of Engineering
Nordvik Colo
Stockholm, SE
Project Finance Lead
Granton Infrastructure
London, UK
Sample profiles. Real names and outreach details unlock with a subscription, and the relevant contact changes by stage, so records are re-verified as a project advances.
No manual data entry, no missed opportunities. Flexible licensing for internal tools, customer products, analytics platforms, or enterprise applications.
Push discovered projects, stakeholder contacts, and deal opportunities directly into HubSpot the moment they surface.
Map global projects to Salesforce opportunities in real time. Enrich records with procurement timelines, budgets, and verified contacts.
Automatically create leads, accounts, and contacts in Zoho enriched with project stage, budget, and procurement intelligence.
Don't see your tool? Request an integration →
One package covers all endpoints — projects, contacts, tenders, and stakeholders.
Pass your API key at initialization. Supports environment variables out of the box.
Filter by sector, stage, country, value range and more than 40 fields.
Every response already contains stakeholders, contacts and tender data.
WHY TIMING DECIDES
Northern Europe Park & Playground Projects Database owners are among the most secretive buyers in Park & Playground. By the time a project is public, most of its budget is already committed.
Hyperscalers buy land through shell companies and file permits under code names. A campus can be well over a year into development before its end user is confirmed. If your pipeline runs on press releases, you are last to know.
GCs are appointed before ground-breaking, and long-lead equipment is ordered 12 to 24 months before delivery. By the time steel is visible from the highway, most of the contract value is already committed.
The rest lives in planning filings, permits, grid queues, and tender portals across dozens of languages. English keyword alerts were never going to find a permit filed in Bahasa Malaysia.
long-lead window for transformers and large generators, so early visibility decides whether you quote or decline
of contract value typically committed before construction is visible from the road
countries of permit, grid, and tender portals in dozens of languages, between you and a complete pipeline
per week a BD manager spends scanning news, LinkedIn, and portals, per market
WHAT'S INSIDE
Every field is sourced from primary filings in the local language and verified before it reaches your dashboard.
Analysts read municipal filings, environmental approvals, and tender portals in the local language, with every record citing its source document.
Gross and IT MW captured per phase so a campus in Malaysia compares directly with one in Ireland.
Announced capital expenditure converted to USD, with the local-currency figure and conversion date retained.
Named owner, developer, and EPC contacts in every market, re-verified on a rolling 90 day cycle.
Open tenders, shortlists, and awarded packages linked to the project they belong to.
Push new and updated projects straight into your CRM so the pipeline reaches the team that works it.
HONEST COMPARISON
Discovery is now a solved, subscribable problem. Deal selection and relationships are not.
| Capability | Manual research | News alerts | Contact databases | Generic construction DBs | This database |
|---|---|---|---|---|---|
| Pre-announcement discovery | Possible, costly | No | No | Rare | Permits, filings, primary research |
| Park And Playground fields (MW, type, stage) | Build it yourself | No | No | Partial | Native |
| Verified decision-maker contacts | Slow | No | Titles only, unverified | Generic | Researcher-verified, by stage |
| Tender and award tracking | Sporadic | Keyword luck | No | Partial | Systematic, every tracked market |
| Change alerts on specific projects | No | Keyword noise | No | Limited | Project and field level |
| Local-language coverage | Rare | Poor | Poor | Varies | Regional analysts, native language |
| Structured export, API, CRM | Manual | No | Limited | Some | Excel, REST API, Salesforce, HubSpot |
| Institutional memory | Leaves with the employee | None | None | Partial | Permanent, shared, auditable |
| Annual cost | Loaded cost of a researcher | Free plus hidden hours | Per seat | Mid | A fraction of one hire |
| Manual research | Possible, costly |
|---|---|
| News alerts | No |
| Contact databases | No |
| Generic construction DBs | Rare |
| This database | Permits, filings, primary research |
| Manual research | Build it yourself |
|---|---|
| News alerts | No |
| Contact databases | No |
| Generic construction DBs | Partial |
| This database | Native |
| Manual research | Slow |
|---|---|
| News alerts | No |
| Contact databases | Titles only, unverified |
| Generic construction DBs | Generic |
| This database | Researcher-verified, by stage |
| Manual research | Sporadic |
|---|---|
| News alerts | Keyword luck |
| Contact databases | No |
| Generic construction DBs | Partial |
| This database | Systematic, every tracked market |
| Manual research | No |
|---|---|
| News alerts | Keyword noise |
| Contact databases | No |
| Generic construction DBs | Limited |
| This database | Project and field level |
| Manual research | Rare |
|---|---|
| News alerts | Poor |
| Contact databases | Poor |
| Generic construction DBs | Varies |
| This database | Regional analysts, native language |
| Manual research | Manual |
|---|---|
| News alerts | No |
| Contact databases | Limited |
| Generic construction DBs | Some |
| This database | Excel, REST API, Salesforce, HubSpot |
| Manual research | Leaves with the employee |
|---|---|
| News alerts | None |
| Contact databases | None |
| Generic construction DBs | Partial |
| This database | Permanent, shared, auditable |
| Manual research | Loaded cost of a researcher |
|---|---|
| News alerts | Free plus hidden hours |
| Contact databases | Per seat |
| Generic construction DBs | Mid |
| This database | A fraction of one hire |
Trust in a database comes from methodology, not marketing. This is how a record is built, and why you can stake a bid on it.
Analysts assigned by region and languages continuously monitor every source layer. A permit filed in Bahasa Malaysia or a tender in Brazilian Portuguese is not caught by English keyword scraping; it is caught by the person whose job is that market. Automated monitoring flags candidate signals, and researchers qualify them.
Every material fact (capacity, investment, dates, stakeholders) must reconcile across at least two independent sources, with primary documents outranking press coverage. Conflicts are flagged rather than averaged, and estimates are labeled as estimates.
For significant projects and all contact data, researchers confirm directly with project stakeholders. This is where code-named projects get connected to their real owners, the step no automated pipeline performs.
Re-check cycles are tiered by stage, with active projects checked most often. Every record carries its sources and a last-verified timestamp, and watched projects trigger alerts on any change.
FAQ
The Global Project Tracker is a comprehensive database about construction projects around the world covering all phases of development. We find and track projects from the inception stage to completion encompassing all the major industry sectors. Each project profile includes details, such as the project description, status, scope, size, value, funding mode, location, major event dates, and milestones, as well as contact details of the project owner, contractors, and stakeholders.
The database is updated daily, with new projects and tenders being added and updated in a timely manner. To make sure you have the most recent information, you should check the database often and sign up for alerts that will let you know about new projects and tenders that match your criteria.
No, the database includes both new construction projects (greenfield projects) and expansions, renovations, and upgrades to existing structures (brownfield projects).
Yes, the database allows users to search for projects by location, so you can easily find projects and tenders in your area of interest.
No, the database is for anyone interested in the construction industry. This includes manufacturers and suppliers, EPC companies/Developers/Contractors, banks and insurance companies, asset management, operation and maintenance (O&M) companies, logistics and warehousing firms, consulting companies, law firms, and investors, among others.
If you are interested in subscribing to the Global Project Tracker, please contact our sales team via email or our contact form. If you tell us more about your requirements and goals, our team will make a proposal that fits your needs. Once you accept our proposal and complete the payment, we will send you login credentials to access the platform. A customer success specialist will also be available to show you how to use the platform, and a research analyst will be assigned to help you with any questions or problems that may come up during the active subscription period.
You will need to send an email to [email protected] to submit a tender in our database. Our team will share the submission guidelines to ensure your tender is live in our database.
The cost of Global Project Tracker subscription varies based on factors like the number of users, regions, sectors, project development stages, and additional features or services included in the package. Contact our sales team for personalized pricing options and to choose the ideal package for your requirements.
Yes, it is possible to add more users to your subscription anytime. For each extra user you add to your subscription, you will usually have to pay a per-user fee.